| 85-XX2 |
HVS |
$25,000.00 |
$0.00 |
$0.00 |
$0.00 |
$25,000.00 |
Miscellaneous airport improvements- clearing and grubbing, fencing, terminal repair, and roofing T-hangars. |
| 85-XX1 |
AQX |
$75,000.00 |
$150,000.00 |
$0.00 |
$0.00 |
$225,000.00 |
1800' Rwy extension |
| 85-035 |
5J9 |
$15,145.40 |
$15,145.40 |
$0.00 |
$0.00 |
$30,290.80 |
Rehabilitation of runway by routing and sealing the cracks. Then applying two coats of a sand slurry sealant. |
| 85-032A |
HVS |
$2,096.91 |
$2,096.91 |
$0.00 |
$0.00 |
$4,193.82 |
Installation of a PAPI II System on Runway 2 (Amendment) |
| 85-032 |
HVS |
$7,423.95 |
$7,423.95 |
$71,000.00 |
$0.00 |
$85,847.90 |
Medium Intensity Lighting System, Rotating Beacon, PAPI, Rehabilitation of miscellaneous electrical needs. |
| 85-031 |
AIK |
$23,992.00 |
$23,992.00 |
$0.00 |
$0.00 |
$47,984.00 |
Clean and seal cracks in runway 18/36. |
| 85-029 |
DCM |
$18,250.00 |
$18,250.00 |
$272,700.00 |
$0.00 |
$309,200.00 |
Building a portion of parallel taxiway to replace old taxiway and associated stub taxiway. |
| 85-025 |
SPA |
$31,534.55 |
$31,534.55 |
$429,000.00 |
$0.00 |
$492,069.10 |
Twy. "B" reconstruct Twys. "E" & "A" (Sta. 0+75 to Sta. 12+00) and strengthen Twy. "F" (Sta. 0+75 to Sta. 3+50), Twy. "A" (Sta. 12+00 to Sta. 23+60) and the intersection of Rwy. 11-29 & Twy. "C" including misc. grading & drainage-North of Twy. "B". |
| 85-021 |
AND |
$3,200.00 |
$3,200.00 |
$55,800.00 |
$0.00 |
$62,200.00 |
Installation of a medium intensity runway edge lighting system on runway 5-23, installation of vault equipment and misc. airfield lighting cable and rehabilitation of existing airport rotating beacon. |
| 85-019 |
UZA |
$27,667.00 |
$27,667.00 |
$498,000.00 |
$0.00 |
$553,334.00 |
Construction of Safety Area, Relocation of Road, Electrical Vault. (AIP NO. 3-45-0049-03) |
| 85-018 |
CDN |
$8,522.82 |
$8,522.83 |
$124,824.15 |
$0.00 |
$141,869.79 |
Reconstruct a portion of the airport drainage; update airport layout plans, airport boundary survey with corner monuments. |
| 85-013 |
GRD |
$21,000.00 |
$29,500.00 |
$53,325.00 |
$0.00 |
$103,825.00 |
Installation of taxiway lighting. |
| 85-010 |
3J1 |
$4,769.00 |
$4,769.00 |
$0.00 |
$0.00 |
$9,538.00 |
Environmental Assessment for New Runway |
| 85-009 |
UZA |
$18,762.00 |
$18,762.00 |
$253,543.00 |
$0.00 |
$291,067.00 |
Airfield Drainage Improvements & Stub Taxiway. (portion of AIP 3-45-0049-01). |
| 85-005 |
GMU |
$22,900.00 |
$22,900.00 |
$412,200.00 |
$0.00 |
$458,000.00 |
Extend Runway 36 Safety Area (100'x500'): Install taxiway guidance signs; remove excess pavement, realign taxiway lights, and associated items. |
| 85-003A |
FLO |
$5,427.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
Emergency rehab of HIRL on R/W 9-27 and MITL on Taxiways "B","G","D" and "E". Repairs to Taxiway "E", G.A. Apron and Airfield drainage and associated obstruction clearing. AMENDMENT |
| 85-003 |
FLO |
$23,147.00 |
$34,001.12 |
$514,333.17 |
$0.00 |
$571,481.29 |
Emergency rehab of HIRL on R/W 9-27 and MITL on Taxiways "B","G","D" and "E". Repairs to Taxiway "E", G.A. Apron and Airfield drainage and associated obstruction clearing. |
| 85-002 |
RBW |
$26,263.00 |
$52,431.00 |
$472,734.00 |
$0.00 |
$551,428.00 |
Rehabilitation of Runway 5/23. |
| 85-001 |
BNL |
$24,405.00 |
$25,596.00 |
$0.00 |
$0.00 |
$50,001.00 |
Repair of Aircraft Apron, Line-of-sight clearance, Terminal Building Expansion and Relocate Fuel Pump. |
| 84-023 |
AND |
$5,000.00 |
$5,000.00 |
$33,000.00 |
$0.00 |
$43,000.00 |
Pave Apron (150'x300') and stub taxiway (275'x40'), install tie downs and taxiway reflectors |