South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
81-015 99N $125,000.00 $125,000.00 $0.00 $0.00 $250,000.00 Construction of 3600' x 60' paved runway, stub taxiway, and apron.
81-013 LUX $35,702.83 $35,702.83 $0.00 $0.00 $71,405.66 Construction of Terminal Building
81-009 CUB $2,000,000.00 $2,000,000.00 $0.00 $0.00 $4,000,000.00 Construction of new runway, taxiways, terminal building, fuel farm, and related site improvements.
81-005 GSP $15,880.00 $15,881.00 $285,847.00 $0.00 $317,608.00 Preliminary engineering/project formulation, final design and construction inspection and construction of runway and taxiway edge lighting systems.
81-004 38J $12,000.00 $12,000.00 $0.00 $0.00 $24,000.00 Fencing - 8200 linear feet with number 9 gauge chain link with four (4) walk-thru and one (1) drive-thru gate.
81-003A S19 $3,965.50 $3,965.00 $0.00 $0.00 $7,930.50 Construction inspection and testing
81-003 S19 $96,670.00 $96,670.00 $0.00 $0.00 $193,340.00 Paving 3600 feet of runway, stub taxiway and parking apron.
81-002 SPA $1,900.00 $1,900.00 $0.00 $0.00 $3,800.00 Numerous trees...Rwy 11...Rwy threshold temporarily displaced 1,003'. ...In addition, eight new threshold lights (MIRL) in-stalled and coloration of 16 other lights changed. (partial description)
81-001 UDG $125,000.00 $125,000.00 $0.00 $0.00 $250,000.00 Asphalt overlay of Runway 5/23, Stub taxiway and apron.
80-036 SMS $20,750.00 $20,750.00 $373,500.00 $0.00 $415,000.00 Strengthen Runway 4/22, Partial parallel and connecting taxiways and apron.
80-034 SPA $9,957.11 $9,957.11 $179,228.00 $0.00 $199,142.22 Strengthen apron and taxiways C and D, install safety fencing approximate 15,830', install four additional threshold lights on runway 4/22.
80-033 GMU $15,000.00 $15,000.00 $0.00 $0.00 $30,000.00 Construct By-pass Taxiway Runway 36
80-032 MYR $26,287.00 $26,288.00 $210,301.00 $0.00 $262,876.00 Expansion of the Myrtle Beach Jetport aircraft parking apron.
80-031 MYR $46,933.50 $46,933.50 $0.00 $0.00 $93,867.00 Expansion of baggage claim area.
80-030 HYW $12,500.00 $12,500.00 $0.00 $0.00 $25,000.00 Paving of 2000' access road.
80-029 BNL $7,538.00 $17,494.00 $60,306.00 $0.00 $85,338.00 Relocation of Medium Intensity Runway lights on Runway 16/34 and Installation of Safety Fencing.
80-028 BNL $19,855.00 $19,855.00 $303,604.00 $0.00 $343,314.00 Resurface runway 16/34
80-027 JZI $34,000.00 $34,000.00 $0.00 $0.00 $68,000.00 Emergency repairs to taxiway pavement surfaces and deteriorated areas of drainage systems around and beneath these taxiways.
80-026 CAE $5,682.43 $5,682.43 $102,283.74 $0.00 $113,648.60 Grooving Runway 11/29 and reconstruction and strengthening of runway 5/23.
80-025 CAE $40,828.98 $40,828.98 $81,657.96 $0.00 $163,315.92 Installation of concourse elevators for the handicapped.