| 81-015 |
99N |
$125,000.00 |
$125,000.00 |
$0.00 |
$0.00 |
$250,000.00 |
Construction of 3600' x 60' paved runway, stub taxiway, and apron. |
| 81-013 |
LUX |
$35,702.83 |
$35,702.83 |
$0.00 |
$0.00 |
$71,405.66 |
Construction of Terminal Building |
| 81-009 |
CUB |
$2,000,000.00 |
$2,000,000.00 |
$0.00 |
$0.00 |
$4,000,000.00 |
Construction of new runway, taxiways, terminal building, fuel farm, and related site improvements. |
| 81-005 |
GSP |
$15,880.00 |
$15,881.00 |
$285,847.00 |
$0.00 |
$317,608.00 |
Preliminary engineering/project formulation, final design and construction inspection and construction of runway and taxiway edge lighting systems. |
| 81-004 |
38J |
$12,000.00 |
$12,000.00 |
$0.00 |
$0.00 |
$24,000.00 |
Fencing - 8200 linear feet with number 9 gauge chain link with four (4) walk-thru and one (1) drive-thru gate. |
| 81-003A |
S19 |
$3,965.50 |
$3,965.00 |
$0.00 |
$0.00 |
$7,930.50 |
Construction inspection and testing |
| 81-003 |
S19 |
$96,670.00 |
$96,670.00 |
$0.00 |
$0.00 |
$193,340.00 |
Paving 3600 feet of runway, stub taxiway and parking apron. |
| 81-002 |
SPA |
$1,900.00 |
$1,900.00 |
$0.00 |
$0.00 |
$3,800.00 |
Numerous trees...Rwy 11...Rwy threshold temporarily displaced 1,003'. ...In addition, eight new threshold lights (MIRL) in-stalled and coloration of 16 other lights changed. (partial description) |
| 81-001 |
UDG |
$125,000.00 |
$125,000.00 |
$0.00 |
$0.00 |
$250,000.00 |
Asphalt overlay of Runway 5/23, Stub taxiway and apron. |
| 80-036 |
SMS |
$20,750.00 |
$20,750.00 |
$373,500.00 |
$0.00 |
$415,000.00 |
Strengthen Runway 4/22, Partial parallel and connecting taxiways and apron. |
| 80-034 |
SPA |
$9,957.11 |
$9,957.11 |
$179,228.00 |
$0.00 |
$199,142.22 |
Strengthen apron and taxiways C and D, install safety fencing approximate 15,830', install four additional threshold lights on runway 4/22. |
| 80-033 |
GMU |
$15,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Construct By-pass Taxiway Runway 36 |
| 80-032 |
MYR |
$26,287.00 |
$26,288.00 |
$210,301.00 |
$0.00 |
$262,876.00 |
Expansion of the Myrtle Beach Jetport aircraft parking apron. |
| 80-031 |
MYR |
$46,933.50 |
$46,933.50 |
$0.00 |
$0.00 |
$93,867.00 |
Expansion of baggage claim area. |
| 80-030 |
HYW |
$12,500.00 |
$12,500.00 |
$0.00 |
$0.00 |
$25,000.00 |
Paving of 2000' access road. |
| 80-029 |
BNL |
$7,538.00 |
$17,494.00 |
$60,306.00 |
$0.00 |
$85,338.00 |
Relocation of Medium Intensity Runway lights on Runway 16/34 and Installation of Safety Fencing. |
| 80-028 |
BNL |
$19,855.00 |
$19,855.00 |
$303,604.00 |
$0.00 |
$343,314.00 |
Resurface runway 16/34 |
| 80-027 |
JZI |
$34,000.00 |
$34,000.00 |
$0.00 |
$0.00 |
$68,000.00 |
Emergency repairs to taxiway pavement surfaces and deteriorated areas of drainage systems around and beneath these taxiways. |
| 80-026 |
CAE |
$5,682.43 |
$5,682.43 |
$102,283.74 |
$0.00 |
$113,648.60 |
Grooving Runway 11/29 and reconstruction and strengthening of runway 5/23. |
| 80-025 |
CAE |
$40,828.98 |
$40,828.98 |
$81,657.96 |
$0.00 |
$163,315.92 |
Installation of concourse elevators for the handicapped. |