| 87-022 |
CUB |
$14,000.00 |
$14,000.00 |
$0.00 |
$0.00 |
$28,000.00 |
Updating the Airport Layout Plan (ALP) and other planning documents. |
| 87-021 |
UZA |
$30,929.00 |
$30,834.00 |
$555,005.00 |
$0.00 |
$616,768.00 |
Construction of a parallel taxiway, repair runway 01/19, and rehabilitation of the medium intensity runway lighting system. |
| 87-019 |
GMU |
$7,750.00 |
$7,750.00 |
$139,506.00 |
$0.00 |
$155,006.00 |
Replace high intensity lights on Runway 18/36; replace medium intensity taxiway lights on parallel taxiway. Replace omni-directional approach indicator lights, and runway end identifier lights on runway 18/36 replace wind cone and segmented circle. |
| 87-018 |
0A2 |
$14,600.00 |
$14,600.00 |
$0.00 |
$0.00 |
$29,200.00 |
Approach clearing and obstruction removal in the primary surface areas of runway 10/28, marking power lines, and preliminary engineering design for possible future overlay. |
| 87-016A |
PYG |
$2,390.00 |
$2,390.00 |
$0.00 |
$0.00 |
$4,780.00 |
Installation of an Non-directional radio beacon (NDB). |
| 87-016 |
PYG |
$8,000.00 |
$8,000.00 |
$0.00 |
$0.00 |
$16,000.00 |
Installing NDB. |
| 87-015 |
35A |
$1,500.00 |
$1,500.00 |
$0.00 |
$0.00 |
$3,000.00 |
Purchase six (6) OSHA approved fire fighting suits for the Southside Fire Department as they are responsible for providing fire protection. |
| 87-013A |
ARW |
$15,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Terminal Building Construction |
| 87-013 |
ARW |
$80,000.00 |
$80,000.00 |
$0.00 |
$0.00 |
$160,000.00 |
Design, develop and construct a terminal building. |
| 87-011 |
HXD |
$0.00 |
$13,600.00 |
$244,800.00 |
$0.00 |
$258,400.00 |
Crash/Fire/Rescue Station, Rapid Intervention Fire Truck and 36" Rotating Beacon with Tower. AIP Project 3-45=0030-02 |
| 87-010A |
SMS |
$47,690.00 |
$48,000.00 |
$42,310.00 |
$0.00 |
$138,000.00 |
Construction of a 700' runway extension to runway 4/22 including medium intensity runway lights and connecting parallel taxiway with lights. Master Plan Update. |
| 87-010 |
SMS |
$23,506.00 |
$23,506.00 |
$423,103.00 |
$0.00 |
$470,115.00 |
(1) Construct 700' Runway Extension & parallel Taxiway with medium intensity runway and taxiway lights. (2) Master Plan Update |
| 87-009 |
SMS |
$11,650.00 |
$11,650.00 |
$209,700.00 |
$0.00 |
$233,000.00 |
(1) Acquire Clear Zone Land for Runway 4-22 Extension. (2)Environmental Assessment of Runway Extension. |
| 87-004 |
DYB |
$31,292.59 |
$35,638.44 |
$641,492.04 |
$0.00 |
$708,423.08 |
Site Preparation for General Utility Runway, Stub taxiway, and Apron Area. |
| 87-003 |
DYB |
$5,870.96 |
$5,870.96 |
$105,677.30 |
$0.00 |
$117,419.22 |
Install MIRL, MITL, PAPI-2, Beacon, Wind Cone & Segmented Circle. |
| 87-002 |
DYB |
$15,156.60 |
$117,424.26 |
$411,864.88 |
$0.00 |
$544,445.74 |
Land Acquisition and associated cost |
| 87-001 |
DYB |
$49,077.95 |
$49,077.96 |
$836,973.95 |
$0.00 |
$935,129.86 |
Paving of Runway 5/23, Stub Taxiway and Apron Area. |
| 86-xx4 |
CKI |
$60,000.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
Preliminary engineering design and environmental assessment for a 700'runway extension, including the construction of a 4400' parallel taxiway, and 150'x300' apron expansion; widen & strengthen of runway and safety areas. |
| 86-xx3 |
UDG |
$45,000.00 |
$0.00 |
$0.00 |
$0.00 |
$45,000.00 |
Construction Of Airport Terminal Building |
| 86-xx2 |
MNI |
$60,000.00 |
$0.00 |
$0.00 |
$0.00 |
$60,000.00 |
Preliminary engineering for runway extension |