| 84-020 |
3J0 |
$40,000.00 |
$40,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Purchase of land for clearance of approach zones. |
| 84-011 |
5J5 |
$975.00 |
$975.00 |
$0.00 |
$0.00 |
$1,950.00 |
Relocate existing power line from the approach to Runway 22 to the extreme eastern edge of airport property, clear and grub for entrance road right-of-way. |
| 84-010 |
CAE |
$53,488.58 |
$922,522.42 |
$3,323,989.00 |
$0.00 |
$4,300,000.00 |
Extension of Runway 11/29, Reconstruction of Runway 5/23 and associated taxiways and lighting. |
| 84-009 |
HVS |
$18,475.00 |
$18,475.00 |
$332,550.00 |
$0.00 |
$369,500.00 |
Rehabilitate airfield pavement, perimeter fencing, medium intensity lighting, apron expansion, relocate SAVASI, ALP update. |
| 84-008 |
SPA |
$7,760.00 |
$7,760.00 |
$139,680.00 |
$0.00 |
$155,200.00 |
1. Security Fencing; 2. Rehab. Aircraft Apron; 3. Rehab. Auto Parking; 4. Non-destructive testing-Rwy 4-22; 5. Obstruction survey Twy 4-22 & 11-29 |
| 84-007 |
ARW |
$61,138.00 |
$61,468.00 |
$313,007.00 |
$0.00 |
$435,613.00 |
Construct aircraft apron, stub taxiway, and associated lighting, utility relocation, auto parking, and security fencing. |
| 84-006 |
HXD |
$3,909.76 |
$3,909.77 |
$70,375.77 |
$0.00 |
$78,195.30 |
Installation of Medium Intensity Taxiway Lighting System and associated work, and a Master Plan Study update. |
| 84-003 |
LKR |
$26,485.65 |
$26,485.65 |
$476,741.70 |
$0.00 |
$529,713.00 |
Construct and light partial parallel taxiway "A"(2400'x40'), Construct & light Stub Taxiway "B" (170'x40'); Expand general aviation apron (4590 sy); Clear transitional surfaces & clear zones. |
| 84-001 |
RBW |
$5,934.75 |
$5,934.75 |
$71,992.00 |
$0.00 |
$83,861.50 |
Replacement of approximately 1,400 linear feet of deteriorated storm sewer pipe. |
| 83-009 |
S19 |
$30,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
$60,000.00 |
Medium intensity airport lighting system including 10" rotating beacon, and lighted wind cone. |
| 83-007 |
5J9 |
$21,232.03 |
$21,232.03 |
$0.00 |
$0.00 |
$42,464.06 |
700' Runway Extension. |
| 83-005 |
SMS |
$3,764.02 |
$3,764.02 |
$67,752.36 |
$0.00 |
$75,280.39 |
Rehabilitation of the medium intensity runway and taxiway lighting system to bring the system up to current FAA standards. |
| 83-002 |
MAO |
$17,175.00 |
$17,175.00 |
$309,150.00 |
$0.00 |
$343,500.00 |
A. Repair & overlay runways, taxiway, turnarounds & apron. B. Remark all pavements. C. Relocate wind cone & segmented circle. D. Extend runway safety overruns. |
| 83-001 |
LQK |
$3,298.25 |
$3,298.25 |
$59,368.50 |
$0.00 |
$65,965.00 |
Rehabilitation of the Runway and Taxiway Lighting System. |
| 82-009 |
AIK |
$40,169.65 |
$40,169.65 |
$525,586.00 |
$0.00 |
$605,925.30 |
Rehabilitation of runway 6-24, relocate medium intensity runway lights, and markings. |
| 82-007 |
JZI |
$19,388.90 |
$19,388.90 |
$349,000.20 |
$0.00 |
$387,778.00 |
Construct a new partial parallel taxiway to runway 9/27 and storm drainage system repairs. Installation of new medium intensity runway lighting system for runway 9/27 |
| 82-006 |
GSP |
$26,405.00 |
$26,405.00 |
$475,290.00 |
$0.00 |
$528,100.00 |
New General Aviation ramp and taxiway |
| 82-001 |
LKR |
$35,000.00 |
$35,000.00 |
$0.00 |
$0.00 |
$70,000.00 |
Erosion repair and earth moving. |
| 81-017 |
BBP |
$100,000.00 |
$100,000.00 |
$0.00 |
$0.00 |
$200,000.00 |
Construction of terminal building. |
| 81-016 |
S19 |
$32,770.00 |
$32,770.00 |
$0.00 |
$0.00 |
$65,540.00 |
Airport Terminal Building |