| 86-xx1 |
99N |
$25,000.00 |
$0.00 |
$0.00 |
$0.00 |
$25,000.00 |
Installation of Airfield Lighting |
| 86-041 |
6J0 |
$1,955.00 |
$1,956.00 |
$35,193.00 |
$0.00 |
$39,104.00 |
Preparation of an Airport Master Plan Study. Phase I-Airport Requirements, Phase II-Site Evaluation, Phase III-Airport Plans, Phase IV-Scheduling and Cost, and Phase V-Miscellaneous Items. |
| 86-038 |
BBP |
$7,500.00 |
$7,500.00 |
$0.00 |
$0.00 |
$15,000.00 |
Repair of runway surface deterioration occurring in joints or seams resulting from the elements during seventeen years of exposure. |
| 86-037 |
BBP |
$3,000.00 |
$3,000.00 |
$0.00 |
$0.00 |
$6,000.00 |
Marking of Runway And Taxiway |
| 86-036 |
AND |
$3,312.50 |
$3,312.50 |
$0.00 |
$0.00 |
$6,625.00 |
Pave Auto Parking Area |
| 86-034 |
UZA |
$81,000.00 |
$81,000.00 |
$0.00 |
$0.00 |
$162,000.00 |
Installation of Localizer, Equipment needed for a future instrument landing system. |
| 86-032 |
UZA |
$30,929.92 |
$30,929.92 |
$556,732.00 |
$0.00 |
$618,591.84 |
Site Preparation (clearing & drainage) for Runway 19 Safety Area, and Expand Apron (19,987 SY). (AIP 3-45-0049-02) |
| 86-031 |
6J0 |
$19,737.90 |
$19,737.90 |
$0.00 |
$0.00 |
$39,475.80 |
Terminal Building - Phase I. |
| 86-030 |
AND |
$30,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
$60,000.00 |
Expand FBO Apron |
| 86-027 |
AND |
$20,333.34 |
$20,333.34 |
$366,029.00 |
$0.00 |
$406,695.70 |
1. Itinerant Ramp and Taxiway Strengthening 2. Helipads 3. Seal coat FBO Ramp |
| 86-023 |
RBW |
$52,500.00 |
$52,500.00 |
$0.00 |
$0.00 |
$105,000.00 |
Repair and Sealing of Cracks in Runway 9/27, soil sterilization of pavement edges on Runway 17/35, and resealing of joints in concrete apron. |
| 86-013 |
6J0 |
$33,812.00 |
$33,814.00 |
$281,055.00 |
$0.00 |
$348,681.00 |
Construct apron, connect taxiway turn around, edge lighting installation of runway and taxiway and installation of lighted wind cone and rotating beacon. |
| 86-012 |
GMU |
$15,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Routing and sealing of cracks in asphalt on Runway 18-36 and Runway 9-27, and the associated parallel taxiways |
| 86-011 |
HXD |
$4,350.00 |
$4,350.00 |
$0.00 |
$0.00 |
$8,700.00 |
1. Resealing of runway overruns (300'x75') x 2 (600'x75') 2. Remarking of runway overruns from relocated to displaced |
| 86-008 |
AIK |
$28,068.00 |
$28,069.00 |
$505,240.00 |
$0.00 |
$561,377.00 |
Update the airport layout plan, construct 4,600 x 35' parallel taxiway, and a connecting taxiway. |
| 86-007 |
HYW |
$4,505.00 |
$4,505.00 |
$0.00 |
$0.00 |
$9,010.00 |
Apron Lighting & Taxiway Marking |
| 86-006 |
UDG |
$5,145.00 |
$5,145.00 |
$0.00 |
$0.00 |
$10,290.00 |
Purchase and installation of a non-directional beacon |
| 86-004 |
LKR |
$54,000.00 |
$54,000.00 |
$0.00 |
$0.00 |
$108,000.00 |
Construct apron and drainage improvements around T-Hangars, crack seal RWY 6/24 and apron. Paint rotating beacon, remark runway numerals. Reconstruct concrete apron in front of FBO hangar. |
| 86-003 |
OGB |
$6,725.00 |
$6,725.00 |
$0.00 |
$0.00 |
$13,450.00 |
Relocate NDB |
| 86-001 |
GMU |
$15,000.00 |
$15,000.00 |
$244,150.00 |
$0.00 |
$274,150.00 |
Strengthen and seal terminal apron; strengthen FBO apron; strengthen connecting taxiway; install 4' wooden boundary fence in ILS approach area. |