Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
86-xx1 99N $25,000.00 $0.00 $0.00 $0.00 $25,000.00 Installation of Airfield Lighting
86-041 6J0 $1,955.00 $1,956.00 $35,193.00 $0.00 $39,104.00 Preparation of an Airport Master Plan Study. Phase I-Airport Requirements, Phase II-Site Evaluation, Phase III-Airport Plans, Phase IV-Scheduling and Cost, and Phase V-Miscellaneous Items.
86-038 BBP $7,500.00 $7,500.00 $0.00 $0.00 $15,000.00 Repair of runway surface deterioration occurring in joints or seams resulting from the elements during seventeen years of exposure.
86-037 BBP $3,000.00 $3,000.00 $0.00 $0.00 $6,000.00 Marking of Runway And Taxiway
86-036 AND $3,312.50 $3,312.50 $0.00 $0.00 $6,625.00 Pave Auto Parking Area
86-034 UZA $81,000.00 $81,000.00 $0.00 $0.00 $162,000.00 Installation of Localizer, Equipment needed for a future instrument landing system.
86-032 UZA $30,929.92 $30,929.92 $556,732.00 $0.00 $618,591.84 Site Preparation (clearing & drainage) for Runway 19 Safety Area, and Expand Apron (19,987 SY). (AIP 3-45-0049-02)
86-031 6J0 $19,737.90 $19,737.90 $0.00 $0.00 $39,475.80 Terminal Building - Phase I.
86-030 AND $30,000.00 $30,000.00 $0.00 $0.00 $60,000.00 Expand FBO Apron
86-027 AND $20,333.34 $20,333.34 $366,029.00 $0.00 $406,695.70 1. Itinerant Ramp and Taxiway Strengthening 2. Helipads 3. Seal coat FBO Ramp
86-023 RBW $52,500.00 $52,500.00 $0.00 $0.00 $105,000.00 Repair and Sealing of Cracks in Runway 9/27, soil sterilization of pavement edges on Runway 17/35, and resealing of joints in concrete apron.
86-013 6J0 $33,812.00 $33,814.00 $281,055.00 $0.00 $348,681.00 Construct apron, connect taxiway turn around, edge lighting installation of runway and taxiway and installation of lighted wind cone and rotating beacon.
86-012 GMU $15,000.00 $15,000.00 $0.00 $0.00 $30,000.00 Routing and sealing of cracks in asphalt on Runway 18-36 and Runway 9-27, and the associated parallel taxiways
86-011 HXD $4,350.00 $4,350.00 $0.00 $0.00 $8,700.00 1. Resealing of runway overruns (300'x75') x 2 (600'x75') 2. Remarking of runway overruns from relocated to displaced
86-008 AIK $28,068.00 $28,069.00 $505,240.00 $0.00 $561,377.00 Update the airport layout plan, construct 4,600 x 35' parallel taxiway, and a connecting taxiway.
86-007 HYW $4,505.00 $4,505.00 $0.00 $0.00 $9,010.00 Apron Lighting & Taxiway Marking
86-006 UDG $5,145.00 $5,145.00 $0.00 $0.00 $10,290.00 Purchase and installation of a non-directional beacon
86-004 LKR $54,000.00 $54,000.00 $0.00 $0.00 $108,000.00 Construct apron and drainage improvements around T-Hangars, crack seal RWY 6/24 and apron. Paint rotating beacon, remark runway numerals. Reconstruct concrete apron in front of FBO hangar.
86-003 OGB $6,725.00 $6,725.00 $0.00 $0.00 $13,450.00 Relocate NDB
86-001 GMU $15,000.00 $15,000.00 $244,150.00 $0.00 $274,150.00 Strengthen and seal terminal apron; strengthen FBO apron; strengthen connecting taxiway; install 4' wooden boundary fence in ILS approach area.