Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
88-005 CRE $12,714.96 $12,714.95 $228,869.22 $0.00 $254,299.13 Rehabilitation of taxiways
88-004 CRE $62,943.26 $62,943.26 $1,132,978.74 $0.00 $1,258,865.26 Construct a connector taxiway for a full parallel taxiway, rehabilitation of runway 5/23 and medium intensity taxiway lights.
88-003 GYH $19,181.29 $19,181.29 $0.00 $0.00 $38,362.58 Asphalt overlay of badly cracked concrete ramp near Lockheed maintenance hangar.
88-002 GMU $32,056.00 $32,056.00 $577,008.00 $0.00 $641,120.00 Construct taxiways to general aviation apron; construct general apron (225' x 250'); construct T-Hangar taxiways; and install medium intensity taxiway lights
88-001A 6J4 $2,881.13 $2,881.13 $0.00 $0.00 $5,762.26 Crack and slurry seal existing apron and construct a taxiway to a three bay T-hangar.
88-001 6J4 $7,800.00 $7,800.00 $0.00 $0.00 $15,600.00 Slurry seal existing apron and construct a taxiway three bay T-hangar.
87-035 OGB $39,900.00 $89,600.00 $0.00 $0.00 $129,500.00 Rebuild airport administration building which was destroyed by fire on August 28, 1986.
87-034 3J1 $3,650.00 $3,650.00 $0.00 $0.00 $7,300.00 Repairs and a asphalt overlay to the taxiway and ramp.
87-033 CDN $150,196.50 $150,196.50 $0.00 $0.00 $300,393.00 Construct terminal building and auto parking lot
87-032 AQX $5,810.57 $5,810.59 $104,590.48 $0.00 $116,211.64 Medium Intensity Runway and Taxiway Lighting System, Rotating Bacon, and PAPI'S
87-031 GGE $3,400.00 $3,400.00 $53,100.00 $0.00 $59,900.00 Airport Master Plan
87-030 FLO $4,222.00 $4,222.00 $75,985.00 $0.00 $84,429.00 Airport Master Plan
87-029 GYH $1,650.00 $1,650.00 $0.00 $0.00 $3,300.00 Repair of broken concrete on runway 4.
87-028 GYH $7,123.50 $7,123.50 $0.00 $0.00 $14,247.00 Joint & crack sealing on runway 4/22.
87-027 BNL $15,500.00 $15,500.00 $0.00 $0.00 $31,000.00 Recycling Runway 4/22 by using a rejuvenating agent preformed by the Yates Corporation.
87-026 DYB $1,650.00 $1,650.00 $29,704.00 $0.00 $33,004.00 Preparation of Master Plan Study. Phase I - Airport Requirements Phase II - Airport Plans; Phase III - Scheduling and Cost; Phase IV - Miscellaneous Items.
87-025B SPA $1,738.00 $1,738.00 $31,272.00 $0.00 $34,748.00 Update the Airport Layout Plan (ALP).
87-025A SPA $42,645.00 $42,645.00 $767,610.00 $0.00 $852,900.00 Rehabilitation of Runway 4/22 and Obstruction Clearing.
87-024 FLO $6,443.00 $6,443.00 $115,979.00 $0.00 $128,865.00 Part 77 surface clearing on runway 9/27
87-023 OGB $7,515.00 $7,515.00 $135,270.00 $0.00 $150,300.00 Clear obstructions in runway 4 approach, refurbish runway 4/22 medium intensity lights and 36" rotating beacon, and install radio controls for airport lighting system.