| 88-005 |
CRE |
$12,714.96 |
$12,714.95 |
$228,869.22 |
$0.00 |
$254,299.13 |
Rehabilitation of taxiways |
| 88-004 |
CRE |
$62,943.26 |
$62,943.26 |
$1,132,978.74 |
$0.00 |
$1,258,865.26 |
Construct a connector taxiway for a full parallel taxiway, rehabilitation of runway 5/23 and medium intensity taxiway lights. |
| 88-003 |
GYH |
$19,181.29 |
$19,181.29 |
$0.00 |
$0.00 |
$38,362.58 |
Asphalt overlay of badly cracked concrete ramp near Lockheed maintenance hangar. |
| 88-002 |
GMU |
$32,056.00 |
$32,056.00 |
$577,008.00 |
$0.00 |
$641,120.00 |
Construct taxiways to general aviation apron; construct general apron (225' x 250'); construct T-Hangar taxiways; and install medium intensity taxiway lights |
| 88-001A |
6J4 |
$2,881.13 |
$2,881.13 |
$0.00 |
$0.00 |
$5,762.26 |
Crack and slurry seal existing apron and construct a taxiway to a three bay T-hangar. |
| 88-001 |
6J4 |
$7,800.00 |
$7,800.00 |
$0.00 |
$0.00 |
$15,600.00 |
Slurry seal existing apron and construct a taxiway three bay T-hangar. |
| 87-035 |
OGB |
$39,900.00 |
$89,600.00 |
$0.00 |
$0.00 |
$129,500.00 |
Rebuild airport administration building which was destroyed by fire on August 28, 1986. |
| 87-034 |
3J1 |
$3,650.00 |
$3,650.00 |
$0.00 |
$0.00 |
$7,300.00 |
Repairs and a asphalt overlay to the taxiway and ramp. |
| 87-033 |
CDN |
$150,196.50 |
$150,196.50 |
$0.00 |
$0.00 |
$300,393.00 |
Construct terminal building and auto parking lot |
| 87-032 |
AQX |
$5,810.57 |
$5,810.59 |
$104,590.48 |
$0.00 |
$116,211.64 |
Medium Intensity Runway and Taxiway Lighting System, Rotating Bacon, and PAPI'S |
| 87-031 |
GGE |
$3,400.00 |
$3,400.00 |
$53,100.00 |
$0.00 |
$59,900.00 |
Airport Master Plan |
| 87-030 |
FLO |
$4,222.00 |
$4,222.00 |
$75,985.00 |
$0.00 |
$84,429.00 |
Airport Master Plan |
| 87-029 |
GYH |
$1,650.00 |
$1,650.00 |
$0.00 |
$0.00 |
$3,300.00 |
Repair of broken concrete on runway 4. |
| 87-028 |
GYH |
$7,123.50 |
$7,123.50 |
$0.00 |
$0.00 |
$14,247.00 |
Joint & crack sealing on runway 4/22. |
| 87-027 |
BNL |
$15,500.00 |
$15,500.00 |
$0.00 |
$0.00 |
$31,000.00 |
Recycling Runway 4/22 by using a rejuvenating agent preformed by the Yates Corporation. |
| 87-026 |
DYB |
$1,650.00 |
$1,650.00 |
$29,704.00 |
$0.00 |
$33,004.00 |
Preparation of Master Plan Study. Phase I - Airport Requirements Phase II - Airport Plans; Phase III - Scheduling and Cost; Phase IV - Miscellaneous Items. |
| 87-025B |
SPA |
$1,738.00 |
$1,738.00 |
$31,272.00 |
$0.00 |
$34,748.00 |
Update the Airport Layout Plan (ALP). |
| 87-025A |
SPA |
$42,645.00 |
$42,645.00 |
$767,610.00 |
$0.00 |
$852,900.00 |
Rehabilitation of Runway 4/22 and Obstruction Clearing. |
| 87-024 |
FLO |
$6,443.00 |
$6,443.00 |
$115,979.00 |
$0.00 |
$128,865.00 |
Part 77 surface clearing on runway 9/27 |
| 87-023 |
OGB |
$7,515.00 |
$7,515.00 |
$135,270.00 |
$0.00 |
$150,300.00 |
Clear obstructions in runway 4 approach, refurbish runway 4/22 medium intensity lights and 36" rotating beacon, and install radio controls for airport lighting system. |