| 88-027 |
CKI |
$13,935.00 |
$13,936.00 |
$250,839.00 |
$0.00 |
$278,710.00 |
Planning, environmental assessment, construct 700' x 75' extension to runway 14/32, including clearing, drainage, and earthwork. Installation of medium intensity runway lights to the extension and relocation of the VASI system. |
| 88-026 |
LUX |
$4,672.30 |
$15,589.70 |
$0.00 |
$0.00 |
$20,262.00 |
Installation of security fencing, engineering for a centerline survey, installing a non-directional beacon transmitter and Unicom. |
| 88-025 |
HXD |
$57,050.00 |
$57,050.00 |
$1,026,900.00 |
$0.00 |
$1,141,000.00 |
Construct extensions to the parallel taxiway ends of runway 3/21, install localizer/distance measurement equipment (DME), acquire aviation easements, and clearing. |
| 88-024 |
ARW |
$18,667.00 |
$18,667.00 |
$336,000.00 |
$0.00 |
$373,334.00 |
Grading, drainage, paving, and marking for an aircraft parking apron and connecting taxiway. Installation of medium intensity taxiway lights, and precision approach path indicators (PAPI'S). |
| 88-023 |
UZA |
$8,000.00 |
$8,001.00 |
$144,011.00 |
$0.00 |
$160,012.00 |
Installation of medium intensity taxiway lights, multiple projector descent indicators and mark runway with non-precision instrument markings. |
| 88-022 |
OGB |
$56,125.00 |
$56,125.00 |
$0.00 |
$0.00 |
$112,250.00 |
Engineering and other professional services for preparing construction documents for site preparation and grading for a new runway. |
| 88-021 |
UDG |
$28,819.00 |
$28,819.00 |
$0.00 |
$0.00 |
$57,638.00 |
Construct aircraft parking apron and vehicle parking area. |
| 88-020 |
CAE |
$721,186.00 |
$721,186.00 |
$12,981,350.00 |
$0.00 |
$14,423,722.00 |
Extend and strengthening runway 5/23 and construction of connecting taxiways. Project will include filling, grading, paving, erosion control, grassing, installation of box culverts, high intensity runway lights, medium intensity taxiway lights. |
| 88-019 |
BBP |
$5,409.34 |
$5,409.34 |
$97,368.04 |
$0.00 |
$108,186.72 |
Rehabilitate a portion of runway 6/24 caused by a wet subgrade, and repair the 36 inch rotating beacon damaged from a tornado. |
| 88-018 |
GYH |
$5,881.91 |
$5,881.91 |
$0.00 |
$0.00 |
$11,763.82 |
Joint and crack sealing on runway 4/22. |
| 88-016 |
FLO |
$11,625.00 |
$11,625.00 |
$0.00 |
$0.00 |
$23,250.00 |
Expand passenger and screening/holding area in terminal building. |
| 88-015 |
HYW |
$6,607.50 |
$6,607.50 |
$118,937.00 |
$0.00 |
$132,152.00 |
Southwest aircraft parking apron rehabilitation. |
| 88-014 |
HYW |
$62,590.50 |
$62,590.50 |
$1,113,550.00 |
$0.00 |
$1,238,731.00 |
Extend and widen runway 4/22 to 4400' x 75', extend taxiway to a full parallel, expansion to the aircraft parking apron, installation of a medium intensity runway and taxiway lighting system, and the installation of PAPI II visual approach system. |
| 88-013 |
MYR |
$26,738.90 |
$26,738.91 |
$481,300.00 |
$0.00 |
$534,777.81 |
Construction of an expanded aircraft parking apron. |
| 88-012 |
GRD |
$13,000.00 |
$13,000.00 |
$0.00 |
$0.00 |
$26,000.00 |
Crack sealing of runway 9/27 |
| 88-011 |
CKI |
$25,000.00 |
$25,000.00 |
$0.00 |
$0.00 |
$50,000.00 |
Emergency repair to runway 14/32. Removal and replacement of existing damaged pavement and sealing of cracks in asphalt runway. |
| 88-010 |
MYR |
$9,682.00 |
$9,682.00 |
$174,273.00 |
$0.00 |
$193,637.00 |
Comprehensive Master Plan of Aviation Facilities in Horry County |
| 88-009 |
MYR |
$5,257.00 |
$5,257.00 |
$94,617.00 |
$0.00 |
$105,131.00 |
Airport master plan terminal area study |
| 88-008 |
AND |
$138,000.00 |
$138,000.00 |
$0.00 |
$0.00 |
$276,000.00 |
Reconstruction and strengthen apron near cargo hangar, and strengthen connecting taxiway. |
| 88-006 |
CRE |
$9,168.56 |
$9,168.56 |
$165,034.06 |
$0.00 |
$183,371.18 |
Installation of high intensity runway lights for runway 5/23. |