| 89-012 |
CDN |
$4,777.50 |
$4,777.50 |
$0.00 |
$0.00 |
$9,555.00 |
Replace non-directional beacon (NDB) with solid state transmitter by Southern Avionics. |
| 89-011 |
CQW |
$3,750.00 |
$3,750.00 |
$0.00 |
$0.00 |
$7,500.00 |
Installation of runway end identifier lights (REILS) on the end of runway 7. REILS will be unidirectional and will operate off radio control. |
| 89-010 |
GYH |
$34,425.00 |
$34,425.00 |
$0.00 |
$0.00 |
$68,850.00 |
Additional ramp area and second stub taxiway for the new general apron. |
| 89-009 |
SC09 |
$9,539.58 |
$9,539.58 |
$0.00 |
$0.00 |
$19,079.16 |
Construct helicopter landing pad on hospital grounds. |
| 89-008 |
MKS |
$38,503.16 |
$48,503.17 |
$683,056.98 |
$0.00 |
$770,063.31 |
Extend and widen runway 5/23 by 700' X 75'; expand apron; acquire land in fee simple or easements; construct partial parallel taxiway; install medium intensity runway and taxiway lights; clearing/grubbing runway safety zones. |
| 89-007 |
FDW |
$78,372.00 |
$78,372.00 |
$1,410,696.00 |
$0.00 |
$1,567,440.00 |
Land and easement acquisition including associated fees. Design and construct site work for an 1800' runway extension including clearing/grubbing, drainage, erosion control, and relocating wind cone. |
| 89-006 |
CDN |
$8,032.51 |
$8,032.51 |
$144,587.00 |
$0.00 |
$160,652.01 |
Rehabilitate medium intensity runway lights on 5/23; construct stub taxiway, including medium intensity taxiway lights. |
| 89-004 |
GYH |
$28,000.00 |
$28,000.00 |
$24.00 |
$0.00 |
$56,024.00 |
Install an automated weather observation station (AWOS III) |
| 89-003A |
GRD |
$4,288.55 |
$4,288.55 |
$0.00 |
$0.00 |
$8,577.10 |
Joint seal concrete apron using a fuel resistant sealant. |
| 89-003 |
GRD |
$19,750.00 |
$19,750.00 |
$0.00 |
$0.00 |
$39,500.00 |
Rehabilitate concrete apron by removing and cleaning the sealant in the joints and replacing it with an jet fuel resistant sealant. |
| 89-002 |
MYR |
$256,563.00 |
$256,563.00 |
$4,618,125.00 |
$0.00 |
$5,131,251.00 |
Strengthening of Runway 17/35. |
| 89-001 |
6J4 |
$40,000.00 |
$40,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Installation of an medium intensity runway lighting system, rotating beacon, and a precision approach path indicator (PAPI 2). |
| 88-035 |
GRD |
$12,893.20 |
$12,893.20 |
$0.00 |
$0.00 |
$25,786.40 |
Remarking of runway 9/27, painting of rotating beacon tower, and crack sealing taxiway A. |
| 88-034 |
6J0 |
$1,613.34 |
$1,613.34 |
$0.00 |
$0.00 |
$3,226.68 |
Grading and hillside removal which was in violation along runway 17/35. |
| 88-033 |
FLO |
$14,502.00 |
$14,502.00 |
$261,033.00 |
$0.00 |
$290,037.00 |
Develop an exhibit "A" property plat, purchase an aircraft rescue and firefighting vehicle, and constructing a building for the vehicle. |
| 88-032 |
GMU |
$42,637.56 |
$42,637.56 |
$0.00 |
$0.00 |
$85,275.12 |
Replace medium intensity taxiway lights on taxiways "D" and "E", including double edge taxiway stripes; remove existing markings by milling and remarking runway 18/36; and marking north and south aircraft ramps. |
| 88-031 |
SMS |
$15,100.00 |
$15,100.00 |
$271,800.00 |
$0.00 |
$302,000.00 |
Apron and taxiway pavement rehabilitation |
| 88-030 |
CUB |
$6,526.50 |
$6,526.50 |
$0.00 |
$0.00 |
$13,053.00 |
Remark runway 13/31 with non-precision instrument markings. |
| 88-029 |
GSP |
$35,000.00 |
$267,218.00 |
$0.00 |
$0.00 |
$302,218.00 |
Airport planning study, call an Horizon Plan which is a comprehensive planning document addressing the future development needs and opportunities. Also an update to the airport layout plan (ALP). |
| 88-028 |
GYH |
$161,840.00 |
$161,840.00 |
$0.00 |
$0.00 |
$323,680.00 |
Construct new general aviation apron |