| 90-005 |
AND |
$52,936.00 |
$52,937.00 |
$952,856.00 |
$0.00 |
$1,058,729.00 |
Construction of a parallel taxiway to 5/23. Installation of medium intensity taxiway lights and a visual approach descent indicator lighting system. Update the airport layout plan. |
| 90-004 |
DLC |
$35,500.00 |
$35,500.00 |
$0.00 |
$0.00 |
$71,000.00 |
Slurry seal existing airfield pavements of the runway, taxiway, and apron areas. |
| 90-003* |
6J0 |
$1,850.00 |
$1,850.00 |
$0.00 |
$0.00 |
$3,700.00 |
Crack seal and remarking of Runway 17/35 in accordance with SCAC specifications. |
| 90-002 |
ARW |
$15,400.00 |
$15,400.00 |
$0.00 |
$0.00 |
$30,800.00 |
Grading, drainage, paving, and marking of two stub taxiways for future T-hangars. |
| 90-001 |
OGB |
$6,000.00 |
$6,000.00 |
$0.00 |
$0.00 |
$12,000.00 |
Construction of an electrical vault building for storage of airfield lighting equipment. |
| 89-030 |
FDW |
$63,475.00 |
$63,475.00 |
$1,142,548.00 |
$0.00 |
$1,269,498.00 |
Design and construction of the extension and widening of runway 4/22, including a new medium intensity runway lighting system, a multiple projector descent indicator and a apron expansion. |
| 89-028 |
CRE |
$63,250.00 |
$63,250.00 |
$361,842.00 |
$0.00 |
$488,342.00 |
Rehabilitate apron area and construct "fun ride" apron. |
| 89-027 |
FLO |
$71,429.50 |
$71,429.50 |
$1,285,727.00 |
$0.00 |
$1,428,586.00 |
Resurface and mark runway 18/36, resurface and light taxiway "D", reconstruct and light taxiway "E", and install an airfield radio control lighting system. |
| 89-026 |
99N |
$27,500.00 |
$27,500.00 |
$0.00 |
$0.00 |
$55,000.00 |
Develop a airport master plan |
| 89-025 |
OGB |
$34,500.00 |
$34,500.00 |
$0.00 |
$0.00 |
$69,000.00 |
Crack seal all airfield pavements with a rubberized sealant material. |
| 89-024 |
6J0 |
$4,500.00 |
$4,500.00 |
$0.00 |
$0.00 |
$9,000.00 |
Crack seal runway and taxiways using a rubberized sealant. |
| 89-023 |
SPA |
$27,041.00 |
$27,042.00 |
$343,967.00 |
$0.00 |
$398,050.00 |
Rehabilitate of aircraft parking area and installation of a medium intensity taxiway lighting system. |
| 89-022 |
UDG |
$14,274.00 |
$14,275.00 |
$156,145.00 |
$0.00 |
$184,694.00 |
Installation of MIRL, 36" rotating beacon and steel tower, REILS, VADI, radio controlled system, and lighting vault. |
| 89-021 |
OGB |
$5,075.00 |
$5,075.00 |
$91,350.00 |
$0.00 |
$101,500.00 |
Installation of medium intensity taxiway lights (MITL) and taxiway guidance signs. |
| 89-020 |
52J |
$21,072.50 |
$21,072.50 |
$0.00 |
$0.00 |
$42,145.00 |
Engineering services for an paved 3250' runway, turnaround taxiways, apron area, and lighting system. |
| 89-018 |
AIK |
$18,871.00 |
$18,871.00 |
$338,597.00 |
$0.00 |
$376,339.00 |
Reconstruct a portion of Taxiway "A" and apron area. Construct taxiway "B" and the relocation of medium intensity taxiway lights. |
| 89-017 |
DYB |
$12,500.00 |
$12,500.00 |
$0.00 |
$0.00 |
$25,000.00 |
Installation of an non-directional beacon. |
| 89-016 |
CUB |
$45,745.00 |
$45,745.00 |
$0.00 |
$0.00 |
$91,490.00 |
Construction of 400' stop way (Overruns) on either end. Using full strength pavement. |
| 89-015 |
SC09 |
$17,150.00 |
$17,150.00 |
$0.00 |
$0.00 |
$34,300.00 |
Relocate helipad to the center of north side of hospital. Concrete construction with installation of perimeter lights, rotating beacon, wind sock, and fire fighting equipment. |
| 89-013 |
BBP |
$43,221.40 |
$43,221.40 |
$0.00 |
$0.00 |
$86,442.80 |
Rehabilitate medium intensity runway lights on runway 6/24; also installation of precision instrument approach path indicators (PAPI'S) and runway end identifier lights (REILS). |