Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
90-005 AND $52,936.00 $52,937.00 $952,856.00 $0.00 $1,058,729.00 Construction of a parallel taxiway to 5/23. Installation of medium intensity taxiway lights and a visual approach descent indicator lighting system. Update the airport layout plan.
90-004 DLC $35,500.00 $35,500.00 $0.00 $0.00 $71,000.00 Slurry seal existing airfield pavements of the runway, taxiway, and apron areas.
90-003* 6J0 $1,850.00 $1,850.00 $0.00 $0.00 $3,700.00 Crack seal and remarking of Runway 17/35 in accordance with SCAC specifications.
90-002 ARW $15,400.00 $15,400.00 $0.00 $0.00 $30,800.00 Grading, drainage, paving, and marking of two stub taxiways for future T-hangars.
90-001 OGB $6,000.00 $6,000.00 $0.00 $0.00 $12,000.00 Construction of an electrical vault building for storage of airfield lighting equipment.
89-030 FDW $63,475.00 $63,475.00 $1,142,548.00 $0.00 $1,269,498.00 Design and construction of the extension and widening of runway 4/22, including a new medium intensity runway lighting system, a multiple projector descent indicator and a apron expansion.
89-028 CRE $63,250.00 $63,250.00 $361,842.00 $0.00 $488,342.00 Rehabilitate apron area and construct "fun ride" apron.
89-027 FLO $71,429.50 $71,429.50 $1,285,727.00 $0.00 $1,428,586.00 Resurface and mark runway 18/36, resurface and light taxiway "D", reconstruct and light taxiway "E", and install an airfield radio control lighting system.
89-026 99N $27,500.00 $27,500.00 $0.00 $0.00 $55,000.00 Develop a airport master plan
89-025 OGB $34,500.00 $34,500.00 $0.00 $0.00 $69,000.00 Crack seal all airfield pavements with a rubberized sealant material.
89-024 6J0 $4,500.00 $4,500.00 $0.00 $0.00 $9,000.00 Crack seal runway and taxiways using a rubberized sealant.
89-023 SPA $27,041.00 $27,042.00 $343,967.00 $0.00 $398,050.00 Rehabilitate of aircraft parking area and installation of a medium intensity taxiway lighting system.
89-022 UDG $14,274.00 $14,275.00 $156,145.00 $0.00 $184,694.00 Installation of MIRL, 36" rotating beacon and steel tower, REILS, VADI, radio controlled system, and lighting vault.
89-021 OGB $5,075.00 $5,075.00 $91,350.00 $0.00 $101,500.00 Installation of medium intensity taxiway lights (MITL) and taxiway guidance signs.
89-020 52J $21,072.50 $21,072.50 $0.00 $0.00 $42,145.00 Engineering services for an paved 3250' runway, turnaround taxiways, apron area, and lighting system.
89-018 AIK $18,871.00 $18,871.00 $338,597.00 $0.00 $376,339.00 Reconstruct a portion of Taxiway "A" and apron area. Construct taxiway "B" and the relocation of medium intensity taxiway lights.
89-017 DYB $12,500.00 $12,500.00 $0.00 $0.00 $25,000.00 Installation of an non-directional beacon.
89-016 CUB $45,745.00 $45,745.00 $0.00 $0.00 $91,490.00 Construction of 400' stop way (Overruns) on either end. Using full strength pavement.
89-015 SC09 $17,150.00 $17,150.00 $0.00 $0.00 $34,300.00 Relocate helipad to the center of north side of hospital. Concrete construction with installation of perimeter lights, rotating beacon, wind sock, and fire fighting equipment.
89-013 BBP $43,221.40 $43,221.40 $0.00 $0.00 $86,442.80 Rehabilitate medium intensity runway lights on runway 6/24; also installation of precision instrument approach path indicators (PAPI'S) and runway end identifier lights (REILS).