| 90-025 |
S19 |
$3,163.00 |
$3,163.00 |
$0.00 |
$0.00 |
$6,326.00 |
A study to develop the necessary documents to develop a land use zoning plan around the airport. This plan will include height restrictions and incompatible land use. |
| 90-024 |
EOE |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Preparation of a new airport layout plan. This plan includes aerial photography and topographic surveys. |
| 90-023 |
CUB |
$9,069.95 |
$9,069.95 |
$0.00 |
$0.00 |
$18,139.90 |
Update the Airport Layout Plan (ALP). |
| 90-022 |
UDG |
$4,179.52 |
$4,179.53 |
$0.00 |
$0.00 |
$8,359.04 |
Seal coat the existing apron using a coal-tar sealant and seal coat and restripe the auto parking lot. |
| 90-021 |
FDW |
$46,040.00 |
$46,040.00 |
$828,718.00 |
$0.00 |
$920,798.00 |
Construct parallel taxiway and stub connectors, and install medium intensity runway lights. |
| 90-020 |
FLO |
$2,252.00 |
$2,253.00 |
$40,538.00 |
$0.00 |
$45,043.00 |
Installation of lighted runway identification signs for each connecting taxiway to runways 9/27 and 18/36. |
| 90-019 |
GYH |
$11,161.00 |
$11,161.00 |
$200,900.00 |
$0.00 |
$223,222.00 |
Update the airport layout plan, install medium intensity taxiway lights on taxiway "A", electrical vault modifications, and install a 4-Box precision approach path indicators (PAPI'S) on runways 4/22. |
| 90-018 |
SC62 |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Construction of a emergency medical service heliport. |
| 90-017 |
CQW |
$18,216.00 |
$18,216.00 |
$327,881.00 |
$0.00 |
$364,313.00 |
Construct a 1000' runway extension, install medium intensity runway lights and PAPIS, legal fees and appraisals for land acquisition. |
| 90-016 |
GRD |
$8,000.00 |
$8,000.00 |
$0.00 |
$0.00 |
$16,000.00 |
Crack seal the north-south taxiway, and stub taxiway between the storage hangar areas. |
| 90-015 |
AIK |
$78,757.00 |
$78,757.00 |
$0.00 |
$0.00 |
$157,514.00 |
Slurry seal runway 18/36, access road, and auto parking lot. Coal tar seal coat apron and reconstruct portions of the apron areas. Remark runway 18/36 and associated taxiways. |
| 90-014 |
LKR |
$2,110.59 |
$2,110.59 |
$37,991.00 |
$0.00 |
$42,212.18 |
Installation of visual approach descent indicators, (PAPI'S). |
| 90-013 |
AND |
$10,500.00 |
$10,500.00 |
$0.00 |
$0.00 |
$21,000.00 |
Installation of approximately 1,500' of security fencing. |
| 90-012 |
CEU |
$11,250.00 |
$11,250.00 |
$0.00 |
$0.00 |
$22,500.00 |
Crack seal runway, stub taxiway, and apron areas. |
| 90-011 |
GMU |
$14,813.00 |
$14,813.00 |
$66,000.00 |
$0.00 |
$95,626.00 |
Construction of two aircraft helipads. |
| 90-010 |
FDW |
$150,860.00 |
$150,860.00 |
$0.00 |
$0.00 |
$301,720.00 |
Construct terminal building and parking lot |
| 90-009 |
CQW |
$9,000.00 |
$9,000.00 |
$0.00 |
$0.00 |
$18,000.00 |
Airport security fencing. |
| 90-008 |
6J4 |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Installation of a medium intensity runway lighting system, high intensity rotating beacon, and a precision approach path indicators (PAPI'S). (Amends original grant) |
| 90-007 |
CRE |
$18,898.20 |
$18,898.20 |
$0.00 |
$0.00 |
$37,796.40 |
Seal coat existing apron area of Ramp 66. |
| 90-006 |
CDN |
$11,475.00 |
$11,475.00 |
$0.00 |
$0.00 |
$22,950.00 |
Installation of visual approach aid (PLASI) for runway 5/23. |