South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
91-020 GSP $2,116.40 $2,116.40 $38,095.19 $0.00 $42,328.00 The purchase and installation of equipment to meet FAA's PART 107.14 security requirements.
91-019 FLO $17,810.00 $17,810.00 $320,580.00 $0.00 $356,200.00 Overlay the northern portion of taxiway "B", renovate the medium intensity runway lights (MIRL) on runway 18/36, wiring in the electrical vault, and install a new emergency generator.
91-018 LQK $18,760.00 $18,760.00 $187,696.00 $0.00 $225,216.00 Construct taxiway turnaround to runway 22, remark the existing runway and taxiways, and update airport layout plan (ALP).
91-017 CDN $2,800.00 $2,800.00 $0.00 $0.00 $5,600.00 Obstruction (trees) removal at the end of runway 5 and refurbishing the airport beacon tower.
91-016A 35A $4,000.00 $4,000.00 $0.00 $0.00 $8,000.00 Installation of two drain culverts and repair eroded areas along the embankments of the runway.
91-016 35A $10,000.00 $10,000.00 $0.00 $0.00 $20,000.00 Installation of drain culverts and repair eroded areas along the sides of runway 5/23.
91-015 CEU $7,536.00 $7,537.00 $135,652.00 $0.00 $150,725.00 Upgrade the low intensity runway lighting system to a medium intensity lighting system, installation of runway end identifier lights (REILS), recabling the visual approach slope indicator lights (VASI), install a new segmented circle, wind cone.
91-014 FLO $62,190.00 $62,190.00 $0.00 $0.00 $124,380.00 Cleaning, sterilizing, and sealing pavement cracks on runway 9/27
91-013 LQK $12,610.62 $12,610.63 $0.00 $0.00 $25,221.25 Crack seal the runway and taxiways, including cleaning and sterilizing vegetation. Also apply a coal-tar rubberized pitch emulsion seal coat to the existing apron.
91-012 CUB $130,833.50 $130,833.50 $2,355,000.00 $0.00 $2,616,667.00 Construct storm drainage system on west side of Runway 31 to eliminate the existing open ditch which is within the runway safety area.
91-011 FLO $45,000.00 $45,000.00 $0.00 $0.00 $90,000.00 Phase II - Security Fencing. Installation of 10,100 linear feet of 6' chain link fencing with 3 strands of barbed wire.
91-010 CRE $18,110.00 $18,110.00 $325,981.00 $0.00 $362,201.00 Extend partial parallel to a full parallel taxiway.
91-009 FLO $51,000.00 $51,000.00 $0.00 $0.00 $102,000.00 Security fencing - Phase I which consist of 11,100 linear feet of 6' chain link fence with 3 strands of barbed wire.
91-008 EOE $26,812.11 $26,812.11 $0.00 $0.00 $53,624.22 Crack sealing and applying a slurry seal coat type II to runway 4/22, and applying a coal tar emulsion seal coat to the aircraft parking apron.
91-007 LKR $40,152.00 $40,152.00 $722,735.00 $0.00 $803,039.00 Rehabilitate RWY 6/24 by milling and overlaying with an asphalt surface course. Also, refurbishing the medium intensity runway lighting system.
91-006 MNI $21,760.50 $21,760.50 $0.00 $0.00 $43,521.00 Airport Master Plan Study
91-005 LKR $4,265.00 $4,265.00 $0.00 $0.00 $8,530.00 Replace and enlarge concrete pad in front of FBO maintenance facility and the erection of 4' security fence.
91-003 GMU $50,409.00 $50,410.00 $907,367.00 $0.00 $1,008,186.00 Rehabilitate portion of the parallel taxiway to runway 18/36 approximate 1000'; construct partial parallel taxiway to runway 18; expand east apron; modify taxiway guidance signs; install medium intensity taxiway lights; and update the airport layout plan
91-002 UDG $4,712.50 $4,712.50 $0.00 $0.00 $9,425.00 Clear trees in the clear zone at the ends of runways 23 and 28, remove stumps and under growth, grub, disc, and seed. Twenty-nine acres of land owned by the airport are involved.
91-001* CDN $1,768.00 $1,768.00 $0.00 $0.00 $3,536.00 Installation of visual approach aids (PLASI) on runway 5/23.