Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
92-010 RBW $2,600.00 $2,600.00 $0.00 $0.00 $5,200.00 Emergency repairs to the storm drainage system underneath the concrete ramp.
92-009 LQK $30,662.00 $30,662.00 $388,888.00 $0.00 $450,212.00 Expand apron by approximate 9,500 S.Y., and relocate and install new non-directional radio beacon.
92-008 GMU $35,854.30 $35,854.30 $0.00 $0.00 $71,708.60 Installation of medium intensity runway lights (MIRL) on runway 9/27 and installation of retro reflective taxiway markers on the parallel taxiway and connecting taxiways serving runway 9/27.
92-007 SPA $14,000.00 $14,000.00 $0.00 $0.00 $28,000.00 Engineering design services for rehabilitating Taxiway B and expanding the terminal aircraft parking apron.
92-006 GGE $25,000.00 $25,000.00 $0.00 $0.00 $50,000.00 Geo-technical testing using soil borings and radar penetration testing for preliminary design on runway 5/23 for a future runway reconstruction project.
92-005 CDN $6,956.00 $6,957.00 $125,210.00 $0.00 $139,123.00 Apron Drainage Improvement Project. Replacing deteriorated drainage pipe located in the apron area and installing additional catch basins.
92-004 MKS $23,315.80 $23,315.81 $419,684.60 $0.00 $466,316.21 Runway 5/23 rehabilitation and updating the airport layout plan.
92-003 SMS $175,000.00 $175,000.00 $0.00 $0.00 $350,000.00 Renovations and expansion to the existing terminal building.
92-002A 6J0 $3,400.00 $3,400.00 $0.00 $0.00 $6,800.00 Engineering and legal services for land acquisition in the terminal area.
92-002 6J0 $9,000.00 $35,000.00 $98,864.00 $0.00 $142,864.00 Legal, appraisal, and engineering services associated with fee simple acquisition for future terminal expansion and completed parallel taxiway.
92-001 CDN $9,609.00 $9,609.00 $160,000.00 $0.00 $179,218.00 Rehabilitation of Runway 23, re-stripping runway 5/23 to designate runway 6/24 and remark runway numbers on runway 13/31 to 14/32.
91-029 GMU $141,930.54 $1,199,713.46 $0.00 $0.00 $1,341,644.00 Complete interior and exterior renovation of the terminal building, originally constructed in 1953.
91-028 UZA $65,295.00 $65,295.00 $440,090.00 $0.00 $570,680.00 Obstruction removal and land acquisition fees (legal and engineering) under AIP 3-45-0049-08. Completion of the localizer and non-direction beacon (NDB).
91-027 3J1 $4,443.18 $4,443.18 $0.00 $0.00 $8,886.36 Clearing and grubbing of obstructions located on airfield property. Poisoning of vegetation and fence relocation.
91-026 LUX $83,608.00 $83,608.00 $1,504,949.00 $0.00 $1,672,165.00 Reconstruction and widening of runway 7/25, reconstruction of stub taxiway and apron. Place a 700' embankment for a runway extension and installation of a medium intensity runway lighting system (MIRLS).
91-025 CEU $7,879.00 $29,999.00 $340,902.00 $0.00 $378,780.00 Update the airport master plan. Engineering fees, appraisal fees, and legal services associated with the fee-simple property acquisition of 11 acres on parcels D & F with relocation assistance; and parcels C, D, E, & F also will be required.
91-024 GYH $300,000.00 $300,000.00 $300,000.00 $0.00 $900,000.00 Rehabilitation of the first 1000' of runway 4 concrete pavement.
91-023 CDN $39,038.00 $39,038.00 $702,688.00 $0.00 $780,764.00 Extend runway 5 by 500' to a total runway length of 5000'. Extend the connecting taxiway for a partial parallel taxiway, and rehabilitate a portion of the end of runway 5 end and it's connecting taxiway.
91-022 GRD $200,000.00 $200,000.00 $0.00 $0.00 $400,000.00 Construct new 4000'sf terminal building and demolition of existing building.
91-021 AND $5,072.00 $39,668.00 $402,658.00 $0.00 $447,398.00 Acquire aviation easements to runway 5 approach and obstruction tree removal. Including administration an legal services, and engineering fees associated with the fee simple acquisition.