| 93-002 |
GYH |
$6,000.00 |
$6,000.00 |
$0.00 |
$0.00 |
$12,000.00 |
Replacing the runway end identifier lights (REILS) on the end of runway 4. |
| 93-001 |
LKR |
$2,580.54 |
$3,364.05 |
$53,501.27 |
$0.00 |
$59,445.86 |
Amend grant #91-007 for additional residential engineering services, quality control testing, and for change orders for additional materials used by the contractor. |
| 92-030 |
CQW |
$75,000.00 |
$75,000.00 |
$0.00 |
$0.00 |
$150,000.00 |
Construction of a new terminal building, approximately 2,786 S.F. |
| 92-028 |
MKS |
$7,920.00 |
$23,762.51 |
$0.00 |
$0.00 |
$31,682.51 |
Construction of two taxilanes to provide access to a 10 unit T-hangar. |
| 92-027 |
3J1 |
$30,958.00 |
$30,958.00 |
$0.00 |
$0.00 |
$61,916.00 |
Reevaluation of the existing environmental assessment (EA-FONSI approved August 13, 1986) and update the airport layout plan. |
| 92-026 |
LUX |
$42,534.00 |
$42,535.00 |
$765,625.00 |
$0.00 |
$850,694.00 |
Complete the extension to runway 26 by 700'. Construct a taxiway turnaround at the end of runway 26, and a partial parallel taxiway to runway 8, expand the apron, and install medium intensity taxiway and runway lights. |
| 92-025 |
CRE |
$4,527.00 |
$4,528.00 |
$81,495.00 |
$0.00 |
$90,550.00 |
Construction of a 80' X 160' aircraft holding apron located at the end of the parallel taxiway of runway 23. |
| 92-024 |
51J |
$20,516.90 |
$20,516.90 |
$0.00 |
$0.00 |
$41,033.80 |
Construct a 6' chain link fence using nine gauge wire with three strands of barbwire, including access gates. Fence is located west of runway 1/19. |
| 92-023 |
MYR |
$76,232.99 |
$88,456.01 |
$1,482,206.00 |
$0.00 |
$1,646,895.00 |
Develop a Airport Master Plan and Base Re-Utilization Study. Procurement of two (2) 1500 gallon ARFF vehicles and one (1) quick response multi-agent vehicle with a dry chemical system. Installation of a 6-foot chain link security fence with three strands of wire. |
| 92-022 |
GYH |
$55,267.00 |
$55,268.00 |
$45,000.00 |
$0.00 |
$155,535.00 |
Runway 4 rehabilitation, amendment due to unforeseen site conditions. |
| 92-021 |
SPA |
$8,447.07 |
$8,447.07 |
$371,534.61 |
$0.00 |
$388,428.75 |
Overlay a portion of taxiway "B" and the expansion of terminal aircraft parking apron |
| 92-020 |
CUB |
$5,161.99 |
$5,162.00 |
$92,915.91 |
$0.00 |
$103,239.90 |
Acquire land easements for the runway protection zones for runway 13/31 which consist of 13.90 acres. |
| 92-019 |
UZA |
$5,750.00 |
$5,750.00 |
$103,500.00 |
$0.00 |
$115,000.00 |
Airport Master Plan - AIP 3-45-0049-10 |
| 92-018 |
FLO |
$20,324.08 |
$20,324.09 |
$365,833.58 |
$0.00 |
$406,481.75 |
Refurbish the drainage system in the north general aviation parking apron and construct a concrete aircraft parking tarmac, used by commuter aircraft at the terminal building. |
| 92-017 |
AIK |
$12,470.00 |
$12,470.00 |
$0.00 |
$0.00 |
$24,940.00 |
Construction of a 40' X 40' concrete helipad with perimeter lighting. |
| 92-016 |
UZA |
$192,499.89 |
$428,859.11 |
$3,434,443.00 |
$0.00 |
$4,055,802.00 |
Extend runway and taxiway by 500', reconstruct and resurface runway, reconstruct parallel taxiway, reconstruct and expand apron, install medium approach lighting system (MALS); medium intensity runway and taxiway lights; relocate Celanese road, |
| 92-015A |
UDG |
$531.15 |
$538.13 |
$9,190.00 |
$0.00 |
$10,259.28 |
Amendment to SCAC #92-015 for the reconstruction of the parallel taxiway to runway 5/23, including the medium intensity taxiway lighting system and replacement of the wind cone. |
| 92-015 |
UDG |
$28,759.00 |
$28,761.40 |
$517,677.00 |
$0.00 |
$575,197.40 |
Reconstruction of the parallel taxiway to runway 5/23 consisting of 8.5" of crushed aggregate base course and 2" of surface course. Installation a medium intensity taxiway lighting system and replacing wind cone. Overlaying a portion of the parallel taxiway. |
| 92-014 |
GSP |
$22,358.00 |
$22,359.00 |
$280,447.00 |
$0.00 |
$325,164.00 |
Acquire an aircraft rescue and fire fighting vehicle, with a capacity of 1,500 gallons, for a index c airport. |
| 92-012 |
SC09 |
$4,000.00 |
$4,000.00 |
$0.00 |
$0.00 |
$8,000.00 |
Construction of an emergency services helipad. |