| 94-009 |
FLO |
$137,164.00 |
$189,867.00 |
$1,554,522.00 |
$0.00 |
$1,881,553.00 |
Renovation and expansion of the airport terminal building. |
| 94-008 |
GYH |
$22,158.00 |
$22,159.00 |
$398,854.00 |
$0.00 |
$443,171.00 |
Rehabilitate Taxiway "A" by removing deteriorated concrete pavement slabs and replacing with new portland cement concrete (PCC), including the sealing of all concrete joints. |
| 94-007 |
OGB |
$37,035.00 |
$61,143.00 |
$883,607.00 |
$0.00 |
$981,785.00 |
Efforts associated with land acquisition for runway 17/35, which include legal, administration, surveys, negotiation, appraisals, and relocation expenses. Preparation of environmental assessment; 404 permit; wetland mitigation plan; design of runway 17/35. |
| 94-006 |
AIK |
$15,750.00 |
$15,750.00 |
$0.00 |
$0.00 |
$31,500.00 |
Rout, clean, sterilize, and crack seal runway 6/24. Construct segmented circle and install an 36" wind cone frame and sock. |
| 94-005 |
SPA |
$4,901.60 |
$4,901.60 |
$395,768.00 |
$0.00 |
$405,571.20 |
Extend runway 5 safety area |
| 94-004 |
BNL |
$34,000.00 |
$34,000.00 |
$0.00 |
$0.00 |
$68,000.00 |
Phase I - airport drainage improvements. Phase II - upgrade the automated weather observation system (AWOS I) to an AWOS III. |
| 94-003 |
GMU |
$21,125.00 |
$21,125.00 |
$0.00 |
$0.00 |
$42,250.00 |
Cleaning, sterilizing, and sealing of pavement cracks on runways 18/36 and 9/27, including parallel and connecting taxiways. |
| 94-002 |
S19 |
$33,000.00 |
$0.00 |
$0.00 |
$0.00 |
$33,000.00 |
Develop a airport master plan study. |
| 94-001 |
MKS |
$6,750.00 |
$6,750.00 |
$0.00 |
$0.00 |
$13,500.00 |
A planning study to show the justification for extending the existing 3800' runway 5/23 at the Berkeley County Airport to 5500'. |
| 93-015 |
FLO |
$10,728.75 |
$10,728.75 |
$193,117.50 |
$0.00 |
$214,575.00 |
Upgrade the airfield taxiway signage system to meet federal regulations for Part 139 air carrier airports. |
| 93-013 |
UZA |
$28,125.00 |
$28,125.00 |
$0.00 |
$0.00 |
$56,250.00 |
Installation of a remote transmitter and receiver outlet to allow direct communications with the Charlotte Air Traffic Control Tower from the Rock Hill-York County Airport. |
| 93-012 |
CDN |
$19,250.00 |
$19,250.00 |
$346,500.00 |
$0.00 |
$385,000.00 |
Construct partial parallel taxiway to connecting partial parallel taxiway, at runway 24 end, to the apron. |
| 93-011 |
CEU |
$26,150.00 |
$26,151.00 |
$470,709.00 |
$0.00 |
$523,010.00 |
Expand the aircraft parking apron. |
| 93-010 |
GRD |
$47,154.13 |
$47,154.13 |
$848,774.24 |
$0.00 |
$943,082.50 |
Overlay and mark runway 9/27, install a medium intensity runway lighting (MIRL) system, and a precision approach path indicator (PAPI)-2 system. |
| 93-008 |
RBW |
$13,000.00 |
$13,000.00 |
$0.00 |
$0.00 |
$26,000.00 |
Install an omni-directional approach lighting system (ODALS) and a runway end identifier lighting system (REILS) at the end of runway 23. |
| 93-006 |
GGE |
$8,980.00 |
$8,980.00 |
$0.00 |
$0.00 |
$17,960.00 |
Construct taxilane to a ten bay t-hangar and one large storage hangar. |
| 93-005 |
UZA |
$5,850.00 |
$5,850.00 |
$105,300.00 |
$0.00 |
$117,000.00 |
Building demolition and obstruction removal |
| 93-004 |
SPA |
$13,900.00 |
$13,900.00 |
$0.00 |
$0.00 |
$27,800.00 |
Update the Airport Layout Plan (ALP) |
| 93-003A |
HYW |
$8,907.00 |
$8,907.00 |
$160,322.00 |
$0.00 |
$178,136.00 |
Amendment to SCAC No. 93-003 for clearing an additional 42 acres of airport property. |
| 93-003 |
HYW |
$9,099.00 |
$9,099.00 |
$163,779.00 |
$0.00 |
$181,977.00 |
Clearing of approximately 45.21 acres of airport property of all vegetation to a maximum height of 4 inches above the ground. |