Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
96-002 SPA $14,381.50 $14,381.50 $0.00 $0.00 $28,763.00 Construction of a lighted helicopter landing pad.
96-001 HVS $389,727.00 $220,000.00 $0.00 $0.00 $609,727.00 Extend runway 3/21 to 5000' x 75', construct a paved turnaround and install medium intensity edge lights. Installation of precision approach path indicators (PAPIS) and runway end identifier lights (REILS). Obtaining land easements and approach clearing
95-017 OGB $30,495.00 $30,495.00 $548,909.00 $0.00 $609,899.00 Wetland mitigation to offset wetland areas that will be impacted during the construction of runway 17/35.
95-016 DCM $300,000.00 $42,500.00 $0.00 $0.00 $342,500.00 Construct terminal building, rehabilitate the existing apron and portions of the parallel taxiway.
95-015 CKI $856,216.55 $0.00 $400,000.00 $0.00 $1,256,216.55 Reconstructing and overlaying runway 14/32, 4000' x 75' and extending runway 14, 600' x 75'. At completion, runway 14/32 will be 5000' x 75', with medium intensity lighting, serving dual wheel aircraft up to 30,000 lbs.
95-014 UZA $500,000.00 $500,000.00 $0.00 $0.00 $1,000,000.00 Construction of a general aviation terminal building.
95-013 RBW $15,093.59 $15,093.59 $0.00 $0.00 $30,187.18 Removing trees and shrubs in the approach to runway 5.
95-012 OGB $25,770.00 $25,770.00 $463,860.00 $0.00 $515,400.00 Relocate Santee-Cooper electric power transmission line to facilitate the construction of runway 17/35.
95-011 CDN $12,000.00 $15,000.00 $0.00 $0.00 $27,000.00 Crack sealing of airfield pavement areas.
95-010 HYW $35,038.00 $35,039.00 $630,689.00 $0.00 $700,766.00 Rehabilitation and widening of the parallel taxiway to 35', improving the infield drainage by grading and repairing the existing system, and installation of a medium intensity taxiway lighting system.
95-009 DYB $52,333.00 $52,334.00 $942,000.00 $0.00 $1,046,667.00 Construction of a new parallel taxiway to runway 6/24 and installation of a medium intensity lighting system.
95-007 GGE $600,000.00 $157,454.00 $980,386.00 $0.00 $1,737,840.00 Reconstruction of runway 5/23 from station 0+00 to station 50+00 (5000' x 100')
95-006 SC09 $11,210.00 $11,210.00 $0.00 $0.00 $22,420.00 Construction of a hospital helipad.
95-005 OGB $5,993.00 $5,994.00 $107,879.00 $0.00 $119,866.00 Relocate an electrical power transmission line which is owned and operated by the City of Orangeburg Department of Public Utilities. Relocation is required for the construction of runway 17/35.
95-004 SPA $36,700.00 $36,700.00 $0.00 $0.00 $73,400.00 Installation of automated weather observation system (AWOS).
95-003 LKR $22,821.00 $22,822.00 $0.00 $0.00 $45,643.00 Wetland permitting and mitigation plan, NPDES permit, and land disturbance permit for constructing a parallel taxiway.
95-002 DYB $953.34 $953.34 $0.00 $0.00 $1,906.68 Purchasing and installing a lighted wind cone and relocating the segmented circle.
95-001 UDG $21,432.00 $21,432.00 $0.00 $0.00 $42,864.00 Prepare an airport layout plan and narrative report.
94-011 6J4 $6,290.78 $6,290.78 $0.00 $0.00 $12,581.56 Purchase and place Class V, 54" concrete pipe on the end of runway 19.
94-010 AND $49,000.00 $49,000.00 $882,000.00 $0.00 $980,000.00 Runway 5/23 asphalt rehabilitation.