Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
97-009 GGE $40,622.00 $40,623.00 $0.00 $0.00 $81,245.00 Install precision approach path indicator lights (PAPIS) for runway 5/23, VHF transmitter for a automated weather observation station (AWOS), and a clearance delivery system to the Myrtle Beach tower.
97-008 UDG $48,075.47 $52,128.09 $901,832.04 $0.00 $1,002,035.60 Runway 5/23 rehabilitation and widening project including omni-directional approach lights (ODALS) for runway 5.
97-007 SPA $7,500.00 $7,500.00 $0.00 $0.00 $15,000.00 Preliminary design development relative to the construction of a general aviation terminal building.
97-006 SPA $13,722.50 $13,722.50 $0.00 $0.00 $27,445.00 Upgrade the automated weather observation system (AWOS) to include thunderstorm and precipitation detection.
97-005 DCM $10,418.26 $10,418.26 $187,528.72 $0.00 $208,365.24 Installation of medium intensity runway and taxiway lighting, taxiway signage, rotating beacon and tower, and precision approach path indicator lights (PAPIS).
97-004 OGB $153,925.50 $153,925.50 $2,770,654.00 $0.00 $3,078,505.00 Site preparation for runway 17/35 and parallel taxiway
97-002 GMU $29,661.17 $29,661.18 $533,901.15 $0.00 $593,223.50 Extend partial parallel taxiway B (35' x 1,000), rehabilitate taxiway H, and update the airport layout plan
97-001 AQX $22,825.00 $37,793.00 $0.00 $0.00 $60,618.00 Construct taxiways to T-hangars.
96-014 MKS $10,090.00 $10,091.00 $181,632.00 $0.00 $201,813.00 Airfield lighting rehabilitation project.
96-013 CQW $11,000.00 $11,000.00 $0.00 $0.00 $22,000.00 Crack seal and seal coat runway 7/25 including the stub taxiways and apron area.
96-012 LQK $47,571.00 $47,571.00 $489,858.00 $0.00 $585,000.00 Phase I - Site preparation for the northeast partial parallel taxiway, and Phase II - Paving and marking for the northeast partial parallel taxiway.
96-011 RBW $20,020.00 $20,021.00 $0.00 $0.00 $40,041.00 Installation of two, precision approach path indicator lighting systems (PAPI-2) located on the ends of runway 5 and 23.
96-010 RBW $10,000.00 $10,000.00 $0.00 $0.00 $20,000.00 Off-site tree clearing in runway 5 approach & line of sight obstructions removal between runways on airport property.
96-009 DYB $20,250.00 $20,250.00 $0.00 $0.00 $40,500.00 Application of a coal tar sealer/rejuvenator to the aircraft parking apron.
96-008 OGB $3,966.00 $3,967.00 $71,393.00 $0.00 $79,326.00 Planting of wetland trees and shrubs as part of the recent construction of Phase I wetland mitigation areas. The creation of this wetland area is due to the construction of runway 17/35.
96-007 GMU $55,901.94 $55,901.94 $0.00 $0.00 $111,803.88 Reconstruction of a portion of taxiway G, including relocation of the medium intensity taxiway lights.
96-006 AQX $5,000.00 $5,000.00 $0.00 $0.00 $10,000.00 Tree obstruction removal on airport property
96-005 RBW $42,400.00 $42,400.00 $0.00 $0.00 $84,800.00 Updating the airport layout plan, including an exhibit " A" property plat.
96-004 GYH $100,000.00 $210,000.00 $990,000.00 $0.00 $1,300,000.00 Rehabilitate 1000'x150' of concrete on the end of runway 5.
96-003 LKR $24,319.00 $24,320.00 $437,753.00 $0.00 $486,392.00 Phase I development for the construction of a partial parallel taxiway. This phase will consist of constructing two temporary sediment ponds and the associated drainage to comply with federal NPDES and state storm water regulations.