| 98-020 |
OGB |
$126,451.00 |
$126,451.00 |
$2,276,120.00 |
$0.00 |
$2,529,022.00 |
Runway 17/35 paving and lighting project |
| 98-019 |
BBP |
$291,000.00 |
$291,000.00 |
$250,000.00 |
$0.00 |
$832,000.00 |
Design and rehabilitate runway 6/24 and the connecting taxiways. |
| 98-018 |
UDG |
$37,721.00 |
$37,721.00 |
$0.00 |
$0.00 |
$75,442.00 |
Construct taxiways to t-hangars. |
| 98-017 |
LKR |
$103,045.00 |
$103,045.00 |
$1,854,813.00 |
$0.00 |
$2,060,903.00 |
Complete the parallel taxiway for runway 6/24. Stage II will consist of constructing a 3700' x 35' taxiway including medium intensity taxiway lights. |
| 98-016A |
6J4 |
$7,125.00 |
$2,375.00 |
$0.00 |
$0.00 |
$9,500.00 |
Rout, clean, and seal all asphalt cracks on runway 1/19 with a rubberized sealant. Reseal existing cracks and grade runway shoulders. |
| 98-015 |
DYB |
$40,000.00 |
$40,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Installation of an automated weather observation station (AWOS III). |
| 98-014A |
CQW |
$33,525.01 |
$11,175.01 |
$0.00 |
$0.00 |
$44,700.03 |
Seal coat/rejuvenate 4400' x 75' of runway 7/25 including the taxiway turnaround. Repaint runway and taxiway markings. |
| 98-013A |
RBW |
$16,497.00 |
$16,498.00 |
$296,953.00 |
$0.00 |
$329,948.00 |
Overlaying the bituminous portion of the terminal aircraft parking apron and two connecting taxiways, including updating the airport layout plan and exhibit "A" property plat. |
| 98-012 |
MNI |
$140,000.00 |
$207,015.50 |
$0.00 |
$0.00 |
$347,015.50 |
Apron renovations and expansion, including a t-hangar taxiway. |
| 98-011 |
AND |
$11,500.00 |
$11,500.00 |
$0.00 |
$0.00 |
$23,000.00 |
Update the airport layout plan |
| 98-010 |
CEU |
$67,142.39 |
$73,505.89 |
$1,265,834.70 |
$0.00 |
$1,406,483.00 |
Design and construction of a parallel taxiway including medium intensity taxiway lights and associated land acquisition cost. |
| 98-009 |
DCM |
$14,800.00 |
$14,800.00 |
$0.00 |
$0.00 |
$29,600.00 |
GRANT AMENDMENT - CHANGE ORDER - Additional stone base coarse for reconstructing the apron and parallel taxiway. |
| 98-008 |
AIK |
$41,000.00 |
$41,000.00 |
$0.00 |
$0.00 |
$82,000.00 |
Installation of an automated weather observation system (AWOS III). |
| 98-007 |
UZA |
$46,000.00 |
$46,000.00 |
$0.00 |
$0.00 |
$92,000.00 |
Install approximately 10,000 feet of perimeter fencing. |
| 98-006A |
CDN |
$44,250.00 |
$14,750.00 |
$0.00 |
$0.00 |
$59,000.00 |
Resurface existing terminal apron, approximately 10,000 SY. |
| 98-005 |
UZA |
$43,380.00 |
$43,380.00 |
$780,840.00 |
$0.00 |
$867,600.00 |
Install an instrument landing system (ILS) for runway 02. Project consist of three schedules: Schedule I, Site preparation to prevent electronic destruction. Schedule II, Install additional medium intensity approach lights, lighted threshold bar and relocate PAPIS. Schedule III, - Install glide slope antenna for a full instrument landing system. |
| 98-004 |
OGB |
$26,496.50 |
$38,913.06 |
$588,687.35 |
$0.00 |
$654,096.91 |
Clearing and stumping of runway 17/35 and parallel taxiway. |
| 98-003 |
AQX |
$300,000.00 |
$300,000.00 |
$511,906.00 |
$0.00 |
$1,111,906.00 |
Update the airport master plan, rehabilitate runway 17/35, acquire and clear land in the approaches, and improve the runway safety areas. |
| 98-002 |
AIK |
$52,043.91 |
$71,837.67 |
$0.00 |
$0.00 |
$123,881.58 |
Clearing, grading, and paving of a 400' X 35' stub taxiway including connecting t-hangar taxiways. |
| 98-001A |
SMS |
$89,561.25 |
$89,561.25 |
$0.00 |
$0.00 |
$179,122.50 |
Installation of an automated weather observation station (AWOS III) system and a omni-directional approach lighting system for runway 23. |