Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
98-020 OGB $126,451.00 $126,451.00 $2,276,120.00 $0.00 $2,529,022.00 Runway 17/35 paving and lighting project
98-019 BBP $291,000.00 $291,000.00 $250,000.00 $0.00 $832,000.00 Design and rehabilitate runway 6/24 and the connecting taxiways.
98-018 UDG $37,721.00 $37,721.00 $0.00 $0.00 $75,442.00 Construct taxiways to t-hangars.
98-017 LKR $103,045.00 $103,045.00 $1,854,813.00 $0.00 $2,060,903.00 Complete the parallel taxiway for runway 6/24. Stage II will consist of constructing a 3700' x 35' taxiway including medium intensity taxiway lights.
98-016A 6J4 $7,125.00 $2,375.00 $0.00 $0.00 $9,500.00 Rout, clean, and seal all asphalt cracks on runway 1/19 with a rubberized sealant. Reseal existing cracks and grade runway shoulders.
98-015 DYB $40,000.00 $40,000.00 $0.00 $0.00 $80,000.00 Installation of an automated weather observation station (AWOS III).
98-014A CQW $33,525.01 $11,175.01 $0.00 $0.00 $44,700.03 Seal coat/rejuvenate 4400' x 75' of runway 7/25 including the taxiway turnaround. Repaint runway and taxiway markings.
98-013A RBW $16,497.00 $16,498.00 $296,953.00 $0.00 $329,948.00 Overlaying the bituminous portion of the terminal aircraft parking apron and two connecting taxiways, including updating the airport layout plan and exhibit "A" property plat.
98-012 MNI $140,000.00 $207,015.50 $0.00 $0.00 $347,015.50 Apron renovations and expansion, including a t-hangar taxiway.
98-011 AND $11,500.00 $11,500.00 $0.00 $0.00 $23,000.00 Update the airport layout plan
98-010 CEU $67,142.39 $73,505.89 $1,265,834.70 $0.00 $1,406,483.00 Design and construction of a parallel taxiway including medium intensity taxiway lights and associated land acquisition cost.
98-009 DCM $14,800.00 $14,800.00 $0.00 $0.00 $29,600.00 GRANT AMENDMENT - CHANGE ORDER - Additional stone base coarse for reconstructing the apron and parallel taxiway.
98-008 AIK $41,000.00 $41,000.00 $0.00 $0.00 $82,000.00 Installation of an automated weather observation system (AWOS III).
98-007 UZA $46,000.00 $46,000.00 $0.00 $0.00 $92,000.00 Install approximately 10,000 feet of perimeter fencing.
98-006A CDN $44,250.00 $14,750.00 $0.00 $0.00 $59,000.00 Resurface existing terminal apron, approximately 10,000 SY.
98-005 UZA $43,380.00 $43,380.00 $780,840.00 $0.00 $867,600.00 Install an instrument landing system (ILS) for runway 02. Project consist of three schedules: Schedule I, Site preparation to prevent electronic destruction. Schedule II, Install additional medium intensity approach lights, lighted threshold bar and relocate PAPIS. Schedule III, - Install glide slope antenna for a full instrument landing system.
98-004 OGB $26,496.50 $38,913.06 $588,687.35 $0.00 $654,096.91 Clearing and stumping of runway 17/35 and parallel taxiway.
98-003 AQX $300,000.00 $300,000.00 $511,906.00 $0.00 $1,111,906.00 Update the airport master plan, rehabilitate runway 17/35, acquire and clear land in the approaches, and improve the runway safety areas.
98-002 AIK $52,043.91 $71,837.67 $0.00 $0.00 $123,881.58 Clearing, grading, and paving of a 400' X 35' stub taxiway including connecting t-hangar taxiways.
98-001A SMS $89,561.25 $89,561.25 $0.00 $0.00 $179,122.50 Installation of an automated weather observation station (AWOS III) system and a omni-directional approach lighting system for runway 23.