99-016 AIK $27,000.00 $9,000.00 $0.00 $0.00 $36,000.00 Rout, clean, sterilize, and crack seal runway 6/24 and connecting taxiways.
99-015A LKR $1,945.00 $1,945.00 $0.00 $0.00 $3,890.00 Amend 99-015 grant for replacing the non-directional beacon by adding a SA25 AC Single Transmitter.
99-015 LKR $4,800.00 $4,800.00 $0.00 $0.00 $9,600.00 Replace Non-directional beacon.
99-014 CUB $3,835.00 $3,835.00 $69,024.00 $0.00 $76,694.00 (Phase I) Engineering design services for rehabilitating the airfield lighting system.
99-013 GMU $350,000.00 $350,000.00 $0.00 $0.00 $700,000.00 Overlay runway 10/28 and rehabilitate portions of the south aircraft parking apron.
99-012 35A $25,920.00 $25,920.00 $0.00 $0.00 $51,840.00 Update the airport layout plan, aerial topographic mapping, survey control points, and a boundary property plat.
99-011 CRE $7,100.00 $7,100.00 $127,800.00 $0.00 $142,000.00 Prepare airport layout plan updates for Grand Strand Airport and Conway-Horry County Airport, including updating the Horry County general aviation system plan.
99-010A SPA $3,360.00 $1,120.00 $0.00 $0.00 $4,480.00 Crack seal associated taxiways to runway 5/23.
99-010 SPA $18,750.00 $6,250.00 $0.00 $0.00 $25,000.00 Crack seal runway 5/23 and the associated connecting taxiways
99-009 DYB $5,936.00 $5,936.00 $25,000.00 $0.00 $36,872.00 To perform planning services consisting of updating the existing master plan and airport layout plan.
99-008AA SPA $1,039.02 $1,039.02 $18,702.36 $0.00 $20,780.40 Grant amendment for project cost increase for the installation of high intensity runway edge lights.
99-008A SPA $2,580.00 $2,580.00 $0.00 $0.00 $5,160.00 Installation of lighted distance-to-go signs.
99-008 SPA $17,202.00 $17,203.00 $309,636.00 $0.00 $344,041.00 Improve runway 5/23 by removing paved shoulders, install high intensity runway lights (HIRLS), segmented circle, and wind cone.
99-006 AND $50,000.00 $50,174.00 $574,200.00 $0.00 $674,374.00 Rehabilitate portions of taxiway B and C including the apron. Construct t-hangar taxilanes and install medium intensity taxiway lights on taxiway C.
99-005 BNL $64,235.00 $64,235.00 $0.00 $0.00 $128,470.00 Install a omni-directional approach lighting system (ODALS) on the end of runway 16 and including the installation of precision approach path indicator lights on both ends of runway 16/34.
99-004 SPA $13,750.00 $13,750.00 $0.00 $0.00 $27,500.00 Update the airport layout plan.
99-003 GGE $27,440.00 $27,441.00 $0.00 $0.00 $54,881.00 Drainage system improvements.
99-002 RBW $22,691.92 $7,563.97 $54,375.11 $0.00 $84,631.00 Clean and reseal the concrete joints with a silicone joint filler of the terminal aircraft parking apron.
99-001A AIK $51,967.00 $51,967.00 $61,560.00 $0.00 $165,494.00 Runway 6/24 paved shoulder removal and drainage rehabilitation project.
99-001 AIK $22,800.00 $22,800.00 $410,400.00 $0.00 $456,000.00 Rehabilitate and upgrade runway 6/24 medium intensity runway lights, precision approach path indicator lights, omni-directional approach lights, new lighting vault, and recabling the existing taxiway lights.