Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
00-012 LUX $0.00 $22,939.00 $0.00 $0.00 $0.00 Collect inventory data, update aviation activity forecast, analysis demand capacity and facility requirements, review alternatives and implementation plan development. Data will be summarized in a brief narrative report.
00-011 RBW $8,062.50 $2,687.50 $0.00 $0.00 $10,750.00 Rewiring electrical power supply to existing ODAL system on runway 23.
00-010 HVS $45,000.00 $45,000.00 $0.00 $0.00 $90,000.00 Purchase and install an automated weather observation station (AWOS III) system.
00-009 AND $46,266.30 $15,422.10 $0.00 $0.00 $61,688.40 Obstruction removal, grade hill off end of runway 5.
00-008 BNL $31,800.00 $10,600.00 $0.00 $0.00 $42,400.00 Clearing of trees, shrubs, and stumps in the runway protection zones (RPZ) including the areas along side of Runway 16/34 to meet FAR Part 77. Also, seeding the cleared areas for erosion control and enable the owner to maintain it with mowing equipment.
00-007 ARW $12,144.00 $12,144.00 $138,200.00 $0.00 $162,488.00 Replace airfield lighting system and install runway end identifier lights (REILS) on end of runway 24.
00-006A GYH $5,175.00 $1,725.00 $0.00 $0.00 $6,900.00 Change Order - Outline taxiway "A" markings with a black 6" border.
00-006 GYH $51,217.50 $17,072.50 $0.00 $0.00 $68,290.00 Re-mark runway 5/23 and partial parallel taxiway A including taxiway A connectors.
00-005 FLO $46,037.62 $15,345.88 $0.00 $0.00 $61,383.50 Re-mark and crack seal runway 1/19, taxiway B, D, F, H, and the terminal apron.
00-004 CEU $26,347.00 $26,347.00 $0.00 $0.00 $52,694.00 Construct stone base and asphalt surface coarse, pavement markings, and permanent grassing for hangar taxi lanes including associated engineering and professional cost affiliated with paving of the taxilanes serving 14 hangar units.
00-003 ARW $6,250.00 $6,250.00 $0.00 $0.00 $12,500.00 Update the airport layout plan
00-002 GYH $48,843.00 $48,842.00 $879,165.00 $0.00 $976,850.00 Installation of high intensity runway edge lights (HIRLS) and approach lighting system including rail lights (MALSR). Updating the airport master plan.
00-001 LQK $56,000.00 $56,000.00 $0.00 $0.00 $112,000.00 Installation of an automated weather observation station (AWOS III) and associated equipment, including engineering design.
99-023 CUB $18,788.00 $18,788.00 $338,184.00 $0.00 $375,760.00 Installation of new medium intensity runway and taxiway lighting system, precision approach path indicator lights (PAPI'S), and construct new electrical vault.
99-022 AIK $200,000.00 $960,000.00 $0.00 $0.00 $1,160,000.00 Construct new terminal building addition.
99-021 CEU $13,356.50 $13,356.50 $240,417.00 $0.00 $267,130.00 (1) Preparation of plans and specifications through bidding for runway 7/25 overlay, widening, and extension; apron rehabilitation and overlay; and runway safety area improvements. (2) Cemetery analysis and relocation plan (3) Preliminary engineering for
99-020 CEU $20,959.09 $20,959.09 $377,263.80 $0.00 $419,182.00 Relocate Cemetery in Runway 7 Safety Area
99-019 GYH $262,500.00 $87,500.00 $0.00 $0.00 $350,000.00 Runway 5/23 concrete joint sealing and asphalt rehabilitation.
99-018 LQK $61,208.00 $77,100.00 $1,244,759.00 $0.00 $1,383,067.00 Land surveying and appraisal fees; engineering design and construction of the partial parallel taxiway.
99-017 UDG $8,431.00 $8,431.00 $0.00 $0.00 $16,862.00 Install 3,200' of 6' high and 1,000' of 4' high chain link fence. Install three 24' wide 6' high double gates and one 24' wide 4' high double gate.