01-010 52J $2,850.00 $2,850.00 $51,300.00 $0.00 $57,000.00 Prepare an airport layout plan
01-009 ARW $45,391.46 $15,130.48 $0.00 $0.00 $60,521.94 Rejuvenate, crack seal, and mark runway 6/24.
01-008 SMS $11,900.00 $11,900.00 $214,200.00 $0.00 $238,000.00 Complete Phase II airfield lighting project, engineering design services for rehabilitating portions of the parallel taxiway and terminal apron, update the airport layout plan, and install a thunderstorm sensor on the AWOS system.
01-007 GGE $7,173.50 $7,173.50 $129,123.00 $0.00 $143,470.00 Design services for rehabilitating parallel taxiway "A" and installing medium intensity taxiway lights, including engineering planning services for updating the height limitation zoning ordinance and the airport layout plan with a narrative report.
01-006 GGE $46,181.00 $46,181.00 $831,257.00 $0.00 $923,619.00 Rehabilitate parallel taxiway "A" and install medium intensity taxiway lights.
01-005 UDG $3,456.65 $3,456.65 $62,219.00 $0.00 $69,132.30 Design services for rehabilitating and expanding the terminal area aircraft parking apron.
01-004 CEU $105,172.66 $105,172.65 $1,893,108.00 $0.00 $2,103,453.31 Re-construct runway 7-25 by widening, extending, and placing an asphalt overlay; rehabilitating the apron; and improving the runway safety areas.
01-003 OGB $3,135.00 $3,135.00 $0.00 $0.00 $6,270.00 Install a ground-link system to provide direct voice communication to the FAA air traffic control center.
01-002 OGB $54,737.00 $54,737.00 $985,266.00 $0.00 $1,094,740.00 Pave parallel taxiway to runway 17/35 and portions of taxiway "A", parallel to runway 5/23. Install medium intensity taxiway edge lights and identification signs on the parallel taxiway to runway 17/35. Update the airport master plan.
01-001 UZA $26,106.00 $26,106.00 $150,000.00 $0.00 $202,212.00 Rehabilitate taxiway "J' pavement and edge lights, including storm drainage improvements.
00-022 AND $12,450.00 $12,450.00 $224,100.00 $0.00 $249,000.00 Rehabilitate taxiway lighting system.
00-021 AND $12,000.00 $4,000.00 $0.00 $0.00 $16,000.00 Crack seal asphalt pavements of runway 5/23 and the connecting taxiways.
00-019 35A $500,000.00 $0.00 $0.00 $0.00 $500,000.00 Construct two 10-unit t-hangars and connecting taxilanes.
00-018A GMU $1,689.00 $1,689.00 $30,402.00 $0.00 $33,780.00 Grant amendment to cover cost overruns for the installation of MALSF on runway 1 and REILS on runway 19.
00-018 GMU $27,425.00 $27,426.00 $493,655.00 $0.00 $548,506.00 Install a medium intensity approach lighting system with flashers (MALSF) on runway 1 and runway end identifier lights (REILS) on runway 19.
00-017 FLO $33,828.00 $33,828.00 $608,899.00 $0.00 $676,555.00 Runway 9 safety area improvements including design for relocating McCall Blvd., design services for overlaying and marking runway 9/27, Phase I rehabilitate and light taxiway E, relocate runway 19 security fence, and updating the airport layout plan.
00-016 SMS $18,361.00 $18,361.00 $330,489.00 $0.00 $367,211.00 Airfield lighting project (Replace edge lighting on taxiways and runway. Install precision approach path indicator lights (PAPI), runway end identifier lights (REILS), and apron lighting.
00-015 MKS $44,703.00 $44,703.00 $804,661.00 $0.00 $894,067.00 Rehabilitate and expand aircraft parking apron, including an asphalt overlay of the stub taxiway.
00-014 MAO $54,375.00 $18,125.00 $0.00 $0.00 $72,500.00 Rejuvenation of airfield asphalt pavement and painting.
00-013 HVS $5,775.00 $5,775.00 $103,950.00 $0.00 $115,500.00 Prepare plans and specifications for a partial parallel taxiway extension, including rehabilitation of existing apron, and determining property acquisition needs for clearing runway 21 approach per FAA Part 77.