| 09-005 |
RBW |
$3,255.00 |
$3,255.00 |
$123,694.00 |
$0.00 |
$130,204.00 |
Installation of airport security fencing |
| 09-004 |
ARW |
$14,059.00 |
$14,059.00 |
$534,252.00 |
$0.00 |
$562,370.00 |
1) Design services: Runway and taxiway overlay, runway end identifier lights, rotating beacon and windsock replacement; 2) Construction services: Tree obstruction removal |
| 09-003 |
HXD |
$21,629.00 |
$21,629.00 |
$821,912.00 |
$0.00 |
$865,170.00 |
Design services: (1) Replace air carrier apron joint material, (2) Air carrier terminal building improvements, (3) Runway safety area drainage improvements-Administrative Services: Develop a disadvantaged business enterprise program-Construction Services: Tree obstruction removal to approach end of RWY 3. |
| 09-002 |
HXD |
$12,898.00 |
$12,898.00 |
$490,128.00 |
$0.00 |
$515,924.00 |
Planning services: (1) Environmental Assessment for RWY 21 tree obstruction removal, (2) Update airport layout plan; Design Services: (1) Upgrade aircraft rescue and firefighting station (2) Tree obstruction removal to approach end of RWY 3. |
| 09-001 |
EOE |
$47,625.00 |
$15,875.00 |
$0.00 |
$0.00 |
$63,500.00 |
Obstruction removal (tree clearing) on private property to achieve a minimum 20:1 approach slope on the approach end of RWY 4. |
| 08-027 |
35A |
$621.00 |
$9,363.00 |
$190,271.00 |
$0.00 |
$200,255.00 |
Land acquisition assistance services. |
| 08-026 |
ARW |
$7,764.00 |
$7,764.00 |
$295,022.00 |
$0.00 |
$310,550.00 |
Update airport master plan and design services for obstruction removal |
| 08-025 |
CKI |
$27,284.00 |
$27,284.00 |
$1,036,782.00 |
$0.00 |
$1,091,350.00 |
Runway 32 safety area improvements-project consists of constructing a concrete box culvert in an existing water drainage canal. |
| 08-024 |
FLO |
$8,778.00 |
$8,778.00 |
$333,579.00 |
$0.00 |
$351,135.00 |
Construction of a storm water drainage system located inside and near the commercial terminal building. |
| 08-023 |
UZA |
$2,113.00 |
$2,112.00 |
$80,275.00 |
$0.00 |
$84,500.00 |
Design services for a corporate hangar taxiway, entrance road, and t-hangar taxilanes. |
| 08-022 |
PYG |
$8,215.00 |
$8,215.00 |
$312,150.00 |
$0.00 |
$328,580.00 |
Clear and grub approach to runway 5, develop a DBE plan, land acquisition plan, install PAPI, and upgrade house into a terminal building. |
| 08-021 |
UZA |
$24,046.00 |
$24,046.00 |
$913,755.00 |
$0.00 |
$961,847.00 |
Construct corporate hangar and t-hangar taxilanes, including the entrance road serving the corporate hangar area. |
| 08-020 |
GGE |
$93,404.00 |
$62,270.00 |
$0.00 |
$0.00 |
$155,674.00 |
Construct hangar apron and taxiway to serve a corporate hangar area including a paved auto parking area. |
| 08-019 |
CEU |
$31,392.00 |
$31,392.00 |
$1,192,877.00 |
$0.00 |
$1,255,661.00 |
Phase II - Extend runway 7/25 and associated parallel taxiway including runway line-of-sight grade modification. Project grant includes environmental permitting and mitigation, engineering design, construction administration, quality control testing, and resident engineering inspection services. |
| 08-018 |
PHH |
$1,140.00 |
$1,140.00 |
$43,305.00 |
$0.00 |
$45,585.00 |
Install perimeter fencing |
| 08-017 |
CQW |
$10,048.00 |
$10,048.00 |
$381,836.00 |
$0.00 |
$401,932.00 |
Construct a partial parallel taxiway and installation of an electrical vault. |
| 08-016 |
NA |
$66,000.00 |
$0.00 |
$0.00 |
$0.00 |
$66,000.00 |
1- Palmetto Aviation Quarterly Newsletter $18,000
2 - Wings Program $7,000
3 - Aviation Safety Week Program $5,500
4- Airport Safety and Maintenance Programs $7,000
5- SC Aviation Hall of Fame $5,000
6 - Aviation Education Program ( i.e. Wright Flight, Civil Air Patrol) $23,500 |
| 08-015 |
CUB |
$23,082.00 |
$23,083.00 |
$877,132.00 |
$0.00 |
$923,297.00 |
Rehabilitation and reconstruction of a portion of the parallel taxiway "A" |
| 08-014A |
AIK |
$114,095.00 |
$163,443.00 |
$438,467.00 |
$0.00 |
$716,005.00 |
Admen grant 08-014 for completing the installing of a glide slope antenna, and matching local funds for grading the glide slope critical area paid from a 90% FAA grant. |
| 08-014 |
AIK |
$178,053.00 |
$178,053.00 |
$931,000.00 |
$0.00 |
$1,287,106.00 |
Installation of instrument landing system (localizer, glide slope, and DME equipment) |