| 07-014 |
MKS |
$11,737.00 |
$11,737.00 |
$446,000.00 |
$0.00 |
$469,474.00 |
Construct partial parallel taxiway enabling a full parallel taxiway to serve runway 5/23. |
| 07-013 |
CDN |
$22,600.00 |
$22,600.00 |
$858,800.00 |
$0.00 |
$904,000.00 |
Construct partial taxiway to complete a full parallel taxiway system for RWY 6/24. |
| 07-012 |
SMS |
$20,400.00 |
$20,400.00 |
$775,200.00 |
$0.00 |
$816,000.00 |
Relocate a partial parallel taxiway to meet FAA design standards. |
| 07-010 |
MYR |
$1,000,000.00 |
$1,000,000.00 |
$0.00 |
$2,000,000.00 |
$4,000,000.00 |
Construct a new general aviation terminal building |
| 07-009 |
LRO |
$500,000.00 |
$500,000.00 |
$0.00 |
$0.00 |
$1,000,000.00 |
Construct new terminal building |
| 07-008 |
MNI |
$100,166.00 |
$66,777.00 |
$0.00 |
$0.00 |
$166,943.00 |
Construct t-hangar taxiways |
| 07-007 |
RBW |
$75,122.00 |
$75,122.00 |
$2,854,630.00 |
$0.00 |
$3,004,874.00 |
Construct a parallel taxiway to Runway 5/23 including medium intensity LED edge lights. |
| 07-006 |
BNL |
$40,149.00 |
$40,149.00 |
$1,525,675.00 |
$0.00 |
$1,605,973.00 |
Taxiway and apron rehabilitation and lighting project |
| 07-005 |
SPA |
$25,770.00 |
$25,770.00 |
$0.00 |
$0.00 |
$51,540.00 |
New terminal building concept plan |
| 07-004 |
SPA |
$5,640.00 |
$5,640.00 |
$214,301.00 |
$0.00 |
$225,581.00 |
Design services for a new terminal apron. |
| 07-003 |
FLO |
$192,600.00 |
$192,600.00 |
$0.00 |
$0.00 |
$385,200.00 |
Refurbish existing aircraft storage hangar. |
| 07-002 |
HXD |
$7,191.00 |
$7,192.00 |
$129,447.00 |
$0.00 |
$143,830.00 |
Grooving of Runway 3/21 |
| 07-001 |
EOE |
$44,677.00 |
$44,677.00 |
$1,697,713.00 |
$0.00 |
$1,787,067.00 |
Site preparation (clearing, grading, drainage, erosion control) for a new runway. |
| 06-037 |
HXD |
$7,115.00 |
$7,115.00 |
$270,380.00 |
$0.00 |
$284,610.00 |
Conduct a FAA FAR Part 150 noise study. |
| 06-035 |
LKR |
$20,544.00 |
$20,544.00 |
$780,675.00 |
$0.00 |
$821,763.00 |
Rehabilitate the apron and stub the taxiway |
| 06-034 |
DYB |
$21,819.00 |
$21,819.00 |
$829,132.00 |
$0.00 |
$872,770.00 |
Rehabilitate Runway 6/24 and connecting stub taxiway. |
| 06-033 |
EOE |
$9,026.00 |
$27,450.00 |
$693,043.00 |
$0.00 |
$729,519.00 |
Professional service fees for acquiring two tracts of property totaling 44.74 acres including engineering design fees for a new 4000' x 75' runway and for rehabilitating the existing runway into a parallel taxiway. |
| 06-032 |
MKS |
$112,330.14 |
$75,000.00 |
$0.00 |
$0.00 |
$187,330.14 |
Install security fencing |
| 06-031 |
MKS |
$2,195.00 |
$2,195.00 |
$83,410.00 |
$0.00 |
$87,800.00 |
Design services for a full parallel taxiway and wetland mitigation of approximately .6 acres of wetlands including wetland buffers. |
| 06-030 |
CRE |
$2,500.00 |
$2,500.00 |
$95,000.00 |
$0.00 |
$100,000.00 |
Installation of a precision approach path indicator lighting system (PAPI). |