Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
10-013 MKS $94,298.00 $94,298.00 $3,583,309.00 $0.00 $3,771,905.00 Rehabilitate RWY 5/23 with a 9" concrete overlay, new medium intensity runway lights incased in underground conduit, construct storm water drainage canals and associated drainage improvements
10-012 AND $110,591.00 $110,592.00 $4,202,502.00 $0.00 $4,423,685.00 Pavement Study on RWY 5/23 and associated taxiways, rehab and strengthen terminal apron and connecting terminal taxiways, rehabilitate airfield lighting (RWY 5/23 HIRLS, Parallel TWY A & Connecting TWY's, New Lighting Vault, Regulators, and PAPI's on RWY 23)
10-011 LQK $10,850.00 $10,850.00 $412,300.00 $0.00 $434,000.00 Construct and widen a corporate hangar taxiway
10-010 MKS $3,255.00 $3,255.00 $123,694.00 $0.00 $130,204.00 Preliminary engineering design for stormwater drainage analysis and stormwater improvements including runway pavement evaluation and design.
10-008 GMU $11,645.00 $11,645.00 $442,510.00 $0.00 $465,800.00 Retrofit EMAS on the approach end of RWY 19.
10-007 UZA $21,343.00 $21,343.00 $811,047.00 $0.00 $853,733.00 Rehabilitate airfield electrical system including the (MALSR's) - medium intensity approach light system with runway alignment indicator lights.
10-006 52J $6,089.00 $6,089.00 $231,382.00 $0.00 $243,560.00 Installation of medium intensity runway lights, two box precision path indictor lights (PAPI's) on Runway 6/24, rotating beacon, wind cone, and segmented circle
10-005 52J $2,301.00 $2,302.00 $87,453.00 $0.00 $92,056.00 Engineering and administrative design services for a medium intensity runway lighting system, precision approach path indicator lighting system on both runway approach ends, rotating beacon, wind cone, and segmented circle.
10-004 OGB $23,977.00 $35,377.00 $911,126.00 $0.00 $970,480.00 Phase II Apron Expansion
10-003 CUB $4,354.00 $4,354.00 $165,444.00 $0.00 $174,152.00 Environmental assessment for taxiway "A" extension and engineering design services for rehabilitating taxiway "A" and west apron area.
10-002 ARW $26,644.00 $26,644.00 $1,012,466.00 $0.00 $1,065,754.00 Asphalt overlay of Runway 7/25 and connecting stud taxiways; airfield electrical improvements; and Runway 7 Phase II tree obstruction removal.
10-001A HXD $4,095.00 $4,095.00 $155,623.00 $0.00 $163,813.00 Construction services for runway safety area drainage improvements; construction of aircraft rescue and fire fighting station; clearing of Runway 3 trees to meet the 34:1 approach slope; tree mitigation design services, avigation easements, and administrative legal fees. Tasks not previously anticipated: Detailed Tree Survey - locating trees according to Town of HHI. Wetland Approximation Survey.
10-001 HXD $65,125.00 $65,125.00 $2,474,766.00 $0.00 $2,605,016.00 Construction services for runway safety area drainage improvements; construction of aircraft rescue and fire fighting station; clearing of Runway 3 trees (design) to meet the 34:1 approach slope; tree mitigation design services, avigation easements, and administrative legal fees
09-033 35A $9,750.00 $3,250.00 $0.00 $0.00 $13,000.00 Replace rotating beacon
09-032 GYH $16,355.00 $10,904.00 $0.00 $0.00 $27,259.00 Purchase ARFF radio equipment, CFR protective clothing, rescue saws, etc.
09-031 HVS $12,154.00 $12,154.00 $461,860.00 $0.00 $486,168.00 Engineering design for runway 21 approach clearing. Terminal building site preparation (hangar removal, apron expansion, and shade hangar; including engineering and construction
09-030 MYR $136,008.00 $90,672.00 $0.00 $0.00 $226,680.00 Rehabilitate taxiway "E" taxilane service area to general aviation hangars
09-029 CEU $68,811.00 $68,811.00 $2,614,822.00 $0.00 $2,752,444.00 Extend Runway 23 an additional 600' including the parallel taxiway
09-028 FDW $16,232.00 $16,233.00 $616,830.00 $0.00 $649,295.00 Runway 4/22 pavement rehabilitation evaluation and engineering design services, obstruction clearing coordination, and airfield perimeter fencing design and installation.
09-027 BBP $11,787.00 $11,787.00 $447,901.00 $0.00 $471,475.00 Construct hangar taxiway and expand hangar apron area.