| 10-013 |
MKS |
$94,298.00 |
$94,298.00 |
$3,583,309.00 |
$0.00 |
$3,771,905.00 |
Rehabilitate RWY 5/23 with a 9" concrete overlay, new medium intensity runway lights incased in underground conduit, construct storm water drainage canals and associated drainage improvements |
| 10-012 |
AND |
$110,591.00 |
$110,592.00 |
$4,202,502.00 |
$0.00 |
$4,423,685.00 |
Pavement Study on RWY 5/23 and associated taxiways, rehab and strengthen terminal apron and connecting terminal taxiways, rehabilitate airfield lighting (RWY 5/23 HIRLS, Parallel TWY A & Connecting TWY's, New Lighting Vault, Regulators, and PAPI's on RWY 23) |
| 10-011 |
LQK |
$10,850.00 |
$10,850.00 |
$412,300.00 |
$0.00 |
$434,000.00 |
Construct and widen a corporate hangar taxiway |
| 10-010 |
MKS |
$3,255.00 |
$3,255.00 |
$123,694.00 |
$0.00 |
$130,204.00 |
Preliminary engineering design for stormwater drainage analysis and stormwater improvements including runway pavement evaluation and design. |
| 10-008 |
GMU |
$11,645.00 |
$11,645.00 |
$442,510.00 |
$0.00 |
$465,800.00 |
Retrofit EMAS on the approach end of RWY 19. |
| 10-007 |
UZA |
$21,343.00 |
$21,343.00 |
$811,047.00 |
$0.00 |
$853,733.00 |
Rehabilitate airfield electrical system including the (MALSR's) - medium intensity approach light system with runway alignment indicator lights. |
| 10-006 |
52J |
$6,089.00 |
$6,089.00 |
$231,382.00 |
$0.00 |
$243,560.00 |
Installation of medium intensity runway lights, two box precision path indictor lights (PAPI's) on Runway 6/24, rotating beacon, wind cone, and segmented circle |
| 10-005 |
52J |
$2,301.00 |
$2,302.00 |
$87,453.00 |
$0.00 |
$92,056.00 |
Engineering and administrative design services for a medium intensity runway lighting system, precision approach path indicator lighting system on both runway approach ends, rotating beacon, wind cone, and segmented circle. |
| 10-004 |
OGB |
$23,977.00 |
$35,377.00 |
$911,126.00 |
$0.00 |
$970,480.00 |
Phase II Apron Expansion |
| 10-003 |
CUB |
$4,354.00 |
$4,354.00 |
$165,444.00 |
$0.00 |
$174,152.00 |
Environmental assessment for taxiway "A" extension and engineering design services for rehabilitating taxiway "A" and west apron area. |
| 10-002 |
ARW |
$26,644.00 |
$26,644.00 |
$1,012,466.00 |
$0.00 |
$1,065,754.00 |
Asphalt overlay of Runway 7/25 and connecting stud taxiways; airfield electrical improvements; and Runway 7 Phase II tree obstruction removal. |
| 10-001A |
HXD |
$4,095.00 |
$4,095.00 |
$155,623.00 |
$0.00 |
$163,813.00 |
Construction services for runway safety area drainage improvements; construction of aircraft rescue and fire fighting station; clearing of Runway 3 trees to meet the 34:1 approach slope; tree mitigation design services, avigation easements, and administrative legal fees.
Tasks not previously anticipated:
Detailed Tree Survey - locating trees according to Town of HHI.
Wetland Approximation Survey. |
| 10-001 |
HXD |
$65,125.00 |
$65,125.00 |
$2,474,766.00 |
$0.00 |
$2,605,016.00 |
Construction services for runway safety area drainage improvements; construction of aircraft rescue and fire fighting station; clearing of Runway 3 trees (design) to meet the 34:1 approach slope; tree mitigation design services, avigation easements, and administrative legal fees |
| 09-033 |
35A |
$9,750.00 |
$3,250.00 |
$0.00 |
$0.00 |
$13,000.00 |
Replace rotating beacon |
| 09-032 |
GYH |
$16,355.00 |
$10,904.00 |
$0.00 |
$0.00 |
$27,259.00 |
Purchase ARFF radio equipment, CFR protective clothing, rescue saws, etc. |
| 09-031 |
HVS |
$12,154.00 |
$12,154.00 |
$461,860.00 |
$0.00 |
$486,168.00 |
Engineering design for runway 21 approach clearing. Terminal building site preparation (hangar removal, apron expansion, and shade hangar; including engineering and construction |
| 09-030 |
MYR |
$136,008.00 |
$90,672.00 |
$0.00 |
$0.00 |
$226,680.00 |
Rehabilitate taxiway "E" taxilane service area to general aviation hangars |
| 09-029 |
CEU |
$68,811.00 |
$68,811.00 |
$2,614,822.00 |
$0.00 |
$2,752,444.00 |
Extend Runway 23 an additional 600' including the parallel taxiway |
| 09-028 |
FDW |
$16,232.00 |
$16,233.00 |
$616,830.00 |
$0.00 |
$649,295.00 |
Runway 4/22 pavement rehabilitation evaluation and engineering design services, obstruction clearing coordination, and airfield perimeter fencing design and installation. |
| 09-027 |
BBP |
$11,787.00 |
$11,787.00 |
$447,901.00 |
$0.00 |
$471,475.00 |
Construct hangar taxiway and expand hangar apron area. |