| 08-013 |
6J4 |
$2,300.00 |
$2,300.00 |
$87,400.00 |
$0.00 |
$92,000.00 |
Design services for a hangar taxilane and apron area. |
| 08-012 |
CEU |
$53,437.00 |
$53,437.00 |
$2,030,614.00 |
$0.00 |
$2,137,488.00 |
Runway 7/25 Line-of-sight improvements |
| 08-011 |
52J |
$7,120.00 |
$7,120.00 |
$270,542.00 |
$0.00 |
$284,782.00 |
Construction of a new aircraft parking apron and connecting taxiway. |
| 08-010 |
EOE |
$52,632.00 |
$52,632.00 |
$2,000,000.00 |
$0.00 |
$2,105,264.00 |
Paving, marking, and lighting of a new Runway 4/22. |
| 08-009 |
GGE |
$53,725.00 |
$53,725.00 |
$2,041,531.00 |
$0.00 |
$2,148,981.00 |
Extend Runway 5 and the connecting parallel taxiway by 1,000 feet including medium intensity edge lights. Runway 5/23 will become 6,000 feet by 100 feet. |
| 08-008 |
CKI |
$1,764.00 |
$1,764.00 |
$67,021.00 |
$0.00 |
$70,549.00 |
Design services for runway safety area improvements |
| 08-006 |
LKR |
$325,000.00 |
$299,865.00 |
$0.00 |
$0.00 |
$624,865.00 |
Expand apron to the west to accommodate a new t-hangar building and reconstruct taxi lanes serving existing t-hangars. |
| 08-005 |
SPA |
$500,000.00 |
$1,000,000.00 |
$0.00 |
$0.00 |
$1,500,000.00 |
Construct a new general aviation terminal building |
| 08-004 |
LQK |
$372,214.00 |
$372,214.00 |
$543,200.00 |
$0.00 |
$1,287,628.00 |
Construct terminal building |
| 08-003 |
DYB |
$406,000.00 |
$406,000.00 |
$0.00 |
$0.00 |
$812,000.00 |
Construct terminal building |
| 08-002 |
CEU |
$7,400.00 |
$7,400.00 |
$281,217.00 |
$0.00 |
$296,017.00 |
Design services for extending runway 25 and the parallel taxiway by 600' including the runway safety area to meet ARC B-II standards. |
| 08-001 |
PHH |
$2,808.00 |
$2,808.00 |
$106,694.00 |
$0.00 |
$112,310.00 |
Remove obstructions to runway 18/36 |
| 07-022 |
6J0 |
$10,281.00 |
$10,281.00 |
$390,691.00 |
$0.00 |
$411,253.00 |
Rehabilitate airfield lighting which consist of runway and taxiway edge lights, and install PAPI's to runway 17/35. |
| 07-021 |
LQK |
$7,420.00 |
$7,420.00 |
$281,941.00 |
$0.00 |
$296,781.00 |
Design services for a new terminal building, removal of underground storage tank on site of new terminal building, and perform a FAA 405 ANAPC survey to each runway end of 5/23 |
| 07-020 |
SMS |
$8,421.00 |
$8,421.00 |
$320,000.00 |
$0.00 |
$336,842.00 |
Obstruction removal - tree clearing project needed for an instrument landing system. |
| 07-019 |
6J4 |
$1,520.00 |
$1,520.00 |
$57,776.00 |
$0.00 |
$60,816.00 |
Install a two-box precision approach path indicator light system (PAPI's) on end of runway 1. |
| 07-018 |
HVS |
$1,626.00 |
$1,626.00 |
$7,588.00 |
$0.00 |
$10,840.00 |
General aviation terminal building study including development of conceptual drawings and a floor plan layout. |
| 07-016 |
OGB |
$75,292.00 |
$219,291.00 |
$936,184.00 |
$0.00 |
$1,230,767.00 |
Construction and expansion of the terminal apron and t-hangar taxiway; including engineering design fees and for installing a supplemental wind cone. |
| 07-015A |
CUB |
$1,857.19 |
$0.00 |
$0.00 |
$0.00 |
$1,857.19 |
Grant Amendment - For project cost overruns related to the runway, TWY B, and apron rehabilitation project |
| 07-015 |
CUB |
$51,050.00 |
$51,050.00 |
$1,939,882.00 |
$0.00 |
$2,041,982.00 |
Rehabilitate runway 13/31, taxiway "B" and a portion of the apron. |