Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
08-013 6J4 $2,300.00 $2,300.00 $87,400.00 $0.00 $92,000.00 Design services for a hangar taxilane and apron area.
08-012 CEU $53,437.00 $53,437.00 $2,030,614.00 $0.00 $2,137,488.00 Runway 7/25 Line-of-sight improvements
08-011 52J $7,120.00 $7,120.00 $270,542.00 $0.00 $284,782.00 Construction of a new aircraft parking apron and connecting taxiway.
08-010 EOE $52,632.00 $52,632.00 $2,000,000.00 $0.00 $2,105,264.00 Paving, marking, and lighting of a new Runway 4/22.
08-009 GGE $53,725.00 $53,725.00 $2,041,531.00 $0.00 $2,148,981.00 Extend Runway 5 and the connecting parallel taxiway by 1,000 feet including medium intensity edge lights. Runway 5/23 will become 6,000 feet by 100 feet.
08-008 CKI $1,764.00 $1,764.00 $67,021.00 $0.00 $70,549.00 Design services for runway safety area improvements
08-006 LKR $325,000.00 $299,865.00 $0.00 $0.00 $624,865.00 Expand apron to the west to accommodate a new t-hangar building and reconstruct taxi lanes serving existing t-hangars.
08-005 SPA $500,000.00 $1,000,000.00 $0.00 $0.00 $1,500,000.00 Construct a new general aviation terminal building
08-004 LQK $372,214.00 $372,214.00 $543,200.00 $0.00 $1,287,628.00 Construct terminal building
08-003 DYB $406,000.00 $406,000.00 $0.00 $0.00 $812,000.00 Construct terminal building
08-002 CEU $7,400.00 $7,400.00 $281,217.00 $0.00 $296,017.00 Design services for extending runway 25 and the parallel taxiway by 600' including the runway safety area to meet ARC B-II standards.
08-001 PHH $2,808.00 $2,808.00 $106,694.00 $0.00 $112,310.00 Remove obstructions to runway 18/36
07-022 6J0 $10,281.00 $10,281.00 $390,691.00 $0.00 $411,253.00 Rehabilitate airfield lighting which consist of runway and taxiway edge lights, and install PAPI's to runway 17/35.
07-021 LQK $7,420.00 $7,420.00 $281,941.00 $0.00 $296,781.00 Design services for a new terminal building, removal of underground storage tank on site of new terminal building, and perform a FAA 405 ANAPC survey to each runway end of 5/23
07-020 SMS $8,421.00 $8,421.00 $320,000.00 $0.00 $336,842.00 Obstruction removal - tree clearing project needed for an instrument landing system.
07-019 6J4 $1,520.00 $1,520.00 $57,776.00 $0.00 $60,816.00 Install a two-box precision approach path indicator light system (PAPI's) on end of runway 1.
07-018 HVS $1,626.00 $1,626.00 $7,588.00 $0.00 $10,840.00 General aviation terminal building study including development of conceptual drawings and a floor plan layout.
07-016 OGB $75,292.00 $219,291.00 $936,184.00 $0.00 $1,230,767.00 Construction and expansion of the terminal apron and t-hangar taxiway; including engineering design fees and for installing a supplemental wind cone.
07-015A CUB $1,857.19 $0.00 $0.00 $0.00 $1,857.19 Grant Amendment - For project cost overruns related to the runway, TWY B, and apron rehabilitation project
07-015 CUB $51,050.00 $51,050.00 $1,939,882.00 $0.00 $2,041,982.00 Rehabilitate runway 13/31, taxiway "B" and a portion of the apron.