| 17-016 |
ARW |
$35,796.00 |
$36,850.00 |
$653,810.00 |
$0.00 |
$726,456.00 |
Runway 7 tree removal, design and bidding services for extending parallel taxiway to the end of runway 25, apron expansion, helipad, and runway safety area improvements, including storm water polution prevention plan. |
| 17-015 |
3J1 |
$11,490.00 |
$11,491.00 |
$206,830.00 |
$0.00 |
$229,811.00 |
Engineering design services for a terminal apron and auto parking lot, including terminal access road |
| 17-014 |
UDG |
$10,613.00 |
$10,613.00 |
$191,032.00 |
$0.00 |
$212,258.00 |
Engineering design and bidding services to rehabilitate RWY 5/23 |
| 17-013 |
HXD |
$363,803.00 |
$363,804.00 |
$6,548,467.00 |
$0.00 |
$7,276,074.00 |
Install engineering material arresting system (EMAS) on end of RWY 3, extend RWY 3, RWY 3/21 object free area (OFA) relocation expenses, install window shades in the air traffic control tower, and execute an independent fee review of construction administration and resident inspector services including material testing services by the geotechnical firm |
| 17-012 |
PYG |
$19,928.00 |
$19,928.00 |
$358,705.00 |
$0.00 |
$398,561.00 |
Construct runway 5 taxiway turnaround |
| 17-011 |
LKR |
$91,810.00 |
$91,810.00 |
$1,652,582.00 |
$0.00 |
$1,836,202.00 |
Expand aircraft parking area (435' X 225') |
| 17-010 |
SMS |
$63,471.00 |
$63,471.00 |
$1,142,481.00 |
$0.00 |
$1,269,423.00 |
Rehabilitate airfield lighting system |
| 17-009 |
99N |
$3,580.00 |
$3,580.00 |
$64,444.00 |
$0.00 |
$71,604.00 |
Avigation easement obstruction identification and tree clearing |
| 17-008 |
6J0 |
$194,905.00 |
$194,905.00 |
$3,508,285.00 |
$0.00 |
$3,898,095.00 |
Reconstruct Runway 18/36 and the runway safety area, including installation of runway edge light transformers |
| 17-007 |
CUB |
$31,049.00 |
$31,049.00 |
$558,881.00 |
$0.00 |
$620,979.00 |
Install twenty eight (28) lighted airfield guidance signs. |
| 17-006 |
FLO |
$203,892.00 |
$203,892.00 |
$3,670,051.00 |
$0.00 |
$4,077,835.00 |
Construct aircraft rescue and fire fighting (ARFF) building |
| 17-005 |
GRD |
$10,502.00 |
$10,502.00 |
$189,041.00 |
$0.00 |
$210,045.00 |
Rehabilitate asphalt entrance road and auto parking lot |
| 17-004 |
CQW |
$10,175.00 |
$10,175.00 |
$183,145.00 |
$0.00 |
$203,495.00 |
Engineering design and easement analysis for obstruction removal |
| 17-003 |
LUX |
$14,529.00 |
$14,529.00 |
$261,529.00 |
$0.00 |
$290,587.00 |
Rehabilitate auto parking area with concrete pavement |
| 17-002 |
GMU |
$17,554.00 |
$17,555.00 |
$315,983.00 |
$0.00 |
$351,092.00 |
Engineering design services for airfield lighting system rehab to RWY 1/19, TWY "A" & TWY "B" , MALSF system to RWY 1, including taxiway "B" pavement design services. |
| 16-034 |
AND |
$36,737.00 |
$36,737.00 |
$661,268.00 |
$0.00 |
$734,742.00 |
Phase II - Acquire avigation easements and remove trees in the approach to runway 23. |
| 16-033 |
HYW |
$35,845.00 |
$35,845.00 |
$645,216.00 |
$0.00 |
$716,906.00 |
Rehabilitate runway and taxiway edge lighting system, including a new lighted wind cone frame. |
| 16-032 |
GYH |
$40,729.00 |
$40,729.00 |
$733,125.00 |
$0.00 |
$814,583.00 |
(1) RWY 5/23 concerete joint replacement, asphalt rejuvenation, and remarking the runway
(2) Engineering design services for reconstructing the north section of TWY "A" |
| 16-031 |
PYG |
$6,100.00 |
$6,100.00 |
$109,800.00 |
$0.00 |
$122,000.00 |
Install a 2-box PAPI system, engineering design services for a taxiway turnaround, and developing a disadvantage business enterprise plan. |
| 16-030 |
3J1 |
$434,563.00 |
$1,054,048.00 |
$13,397,499.00 |
$0.00 |
$14,886,110.00 |
(A) Acquire property both in fee simple and easement.
(B) Phase I - Clearing, grading and drainage for realign runway
© Phase II and III - Pave and light realign runway |