| 11-008 |
CDN |
$12,750.00 |
$12,750.00 |
$484,500.00 |
$0.00 |
$510,000.00 |
Engineering and construction services for relocating and rehabilitating TWY "F" |
| 11-007 |
JZI |
$133,508.48 |
$44,502.82 |
$502,651.00 |
$0.00 |
$680,662.30 |
Airfield maintenance project - Replace selective excessive cracked concrete slabs on runway 4/22 and associated connecting taxiways, joint seal existing concrete pavement and apply runway and taxiway markings. |
| 11-006 |
FDW |
$71,135.00 |
$71,135.00 |
$2,703,130.00 |
$0.00 |
$2,845,400.00 |
Rehabilitate the asphalt pavements of Runway 4/22, the parallel taxiway, and apron with a three inch bituminous asphalt overlay including reimbursement for tree obstruction removal on both runway ends. |
| 11-005 |
BBP |
$8,081.00 |
$2,694.00 |
$0.00 |
$0.00 |
$10,775.00 |
Install new rotating beacon |
| 11-004 |
CEU |
$61,798.00 |
$41,197.00 |
$0.00 |
$0.00 |
$102,995.00 |
Construct t-hangar apron area and taxilanes. |
| 11-003 |
CDN |
$45,360.00 |
$30,240.00 |
$0.00 |
$0.00 |
$75,600.00 |
Preliminary and final engineering design services including bidding assistance services for Taxiway "F" |
| 11-002 |
HXD |
$32,718.00 |
$32,718.00 |
$1,243,296.00 |
$0.00 |
$1,308,732.00 |
RWY 21 Approach: a) airport tree obstruction removal and on airport tree mitigation; b) design service for RWY 3/21 lighted sign relocation; c) legal fees for easement acquisition for off-airport tree obstruction removal; and d) develop a disadvantage business enterprise plan |
| 11-001 |
GGE |
$8,868.00 |
$11,936.00 |
$395,275.00 |
$0.00 |
$416,079.00 |
Runway 23 safety area grading and continuance of environmental mitigation monitoring. |
| 10-023 |
FDW |
$12,217.00 |
$12,217.00 |
$464,260.00 |
$0.00 |
$488,694.00 |
Land easement acquisition and obstruction clearing |
| 10-022 |
6J0 |
$13,535.00 |
$13,535.00 |
$507,201.00 |
$0.00 |
$534,271.00 |
Realign a portion of parallel taxiway "A" |
| 10-021 |
FLO |
$90,266.00 |
$90,266.00 |
$3,430,097.00 |
$0.00 |
$3,610,629.00 |
Reconstruct and expand commercial service terminal apron |
| 10-020AA |
SMS |
$59,770.00 |
$39,847.00 |
$0.00 |
$0.00 |
$99,617.00 |
Contract arbitrator determination awarded payment of an additional 70,000 CY dirt embankment for runway safety area improvement including half of the arbitrator administration fee. |
| 10-020A |
SMS |
$5,237.00 |
$5,237.00 |
$199,006.00 |
$0.00 |
$209,480.00 |
Grant Amendment - Change Order for DHEC stormwater sediment basin, stream mitigation. |
| 10-020 |
SMS |
$34,915.00 |
$34,916.00 |
$1,326,797.00 |
$0.00 |
$1,396,628.00 |
Construction of runway 5/23 safety area enhancement including wetland & stream mitigation and monitoring. |
| 10-019 |
PYG |
$2,475.00 |
$825.00 |
$0.00 |
$0.00 |
$3,300.00 |
Replace rotating beacon motor |
| 10-018 |
AIK |
$2,229.00 |
$2,229.00 |
$84,682.00 |
$0.00 |
$89,140.00 |
Engineering design services for rehabilitating the airfield lighting system |
| 10-017 |
LQK |
$38,795.00 |
$26,115.00 |
$0.00 |
$0.00 |
$64,910.00 |
Engineering design services for widening & relocating a corporate hangar taxiway. Design services include project formulation, surveying, and geotechnical investigation and administration services of "Bridges Property" in the runway 5 runway protection area. |
| 10-016 |
CUB |
$4,655.00 |
$4,655.00 |
$176,899.00 |
$0.00 |
$186,209.00 |
Engineering design for obstruction removal, easement negotiation services, a DBE plan, and reimbursement for security access gate controls. |
| 10-015 |
SMS |
$3,502.00 |
$3,503.00 |
$133,095.00 |
$0.00 |
$140,100.00 |
Engineering design services for runway safety area improvements. |
| 10-014 |
DYB |
$6,848.00 |
$6,848.00 |
$260,223.00 |
$0.00 |
$273,919.00 |
Environmental assessment and preliminary engineering for extending the approach end of Runway 6. |