South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
12-026 GGE $6,561.00 $6,561.00 $118,098.00 $0.00 $131,220.00 Rehabilitate TWY A, including taxiway connectors.
12-025 EOE $4,301.00 $4,301.00 $77,420.00 $0.00 $86,022.00 Apron rehabilitation and expansion (design only).
12-023 GRD $1,596.00 $1,595.50 $60,626.00 $0.00 $63,817.50 Runway 9 Approach Survey and Clearing (FY2011)
12-022 BBP $4,841.00 $13,036.00 $160,893.00 $0.00 $178,770.00 NAVAID Rehabilitation (PAPI, REIL, and Regulator) Land Acquisition Approach Clearing (Design and Bidding Only)
12-021 FDW $6,775.00 $6,775.00 $121,950.00 $0.00 $135,500.00 Engineering Design Services to improve runway safety area
12-020 HVS $10,984.00 $10,983.50 $197,703.00 $0.00 $219,670.50 Runway Safety Area Development (Design) and Approach Obstruction Clearing - RWY 3 and RWY 21 (Design)
12-019 MNI $29,420.00 $29,420.00 $529,560.00 $0.00 $588,400.00 The project consists of surveying obstructions located on properties adjacent to the south end runway, conducting FAA appraisals of the properties that have obstructions that will have to be removed, obtaining navigational easements on those properties and removing the identified obstructions in order to bring the runway up to an LPV of 34:1 per FAA recommendation. Additional navigational easements will be obtained on properties adjacent to the north end runway to allow for additional obstructions to be removed.
12-018 MNI $9,250.00 $9,250.00 $166,500.00 $0.00 $185,000.00 The project consists of surveying obstructions located on properties adjacent to the north runway end, obtaining navigational easements on those properties and removing the identified obstructions in order to accomplish an LPV instrument approach meeting FAA 34:1 criteria.
12-017 HXD $16,061.00 $16,061.00 $289,098.00 $0.00 $321,220.00 Lighted Sign Replacement Runway 21 Tree Removal
12-016 GRD $6,976.00 $6,977.00 $125,578.00 $0.00 $139,531.00 Runway 9 Tree Obstruction Removal Project - Phase 1
12-015 LKR $7,594.00 $7,594.00 $136,698.00 $0.00 $151,886.00 Taxiway 'A' Pavement & Lighting Rehabilitation Project (Design Phase Only)
12-014 CQW $38,193.00 $38,193.15 $687,476.70 $0.00 $763,862.85 Construction, Lighting and Marking of the Final Segment of the Parallel Taxiway System to Runway 8/26
12-013 HXD $37,856.00 $37,857.39 $972,625.00 $0.00 $1,048,338.39 Environmental Assessment and Benefit Cost Analysis for Five-Year CIP, including a Traditional Cultural Properties Analysis requested by the State Historic Preservation Office, Phase III Data Recovery and Public Outreach Program resulting from discovering Mitchellville remnants at the end of Runway 21
12-012 OGB $10,433.00 $10,433.00 $111,458.00 $0.00 $132,324.00 Update the airport layout plan and develop an airport business plan.
12-011 MNI $14,550.00 $4,950.00 $0.00 $0.00 $19,500.00 Refurbish rotating beacon with new wiring and electrical motor. Clean lenses and replace glass as necessary. Repaint beacon tower and platform.
12-009 LUX $327,656.00 $263,999.00 $2,460,322.00 $0.00 $3,051,977.00 Rehabilitate RWY 8/26 and apron area with 5" concrete overlay. 152' paved overrun.
12-008 UZA $98,579.00 $98,584.00 $1,807,433.00 $0.00 $2,004,596.00 Rehabilitate Runway 2/20 with a two inch asphalt surface course, over a double surface treatment, including engineering design and construction services
12-007 OGB $2,120.00 $2,120.00 $0.00 $0.00 $4,240.00 Perform surveying services for creating approach surface drawings used in community/airport planning and land use development control.
12-006 CKI $37,072.00 $37,072.00 $1,408,746.00 $0.00 $1,482,890.00 Extend existing partial parallel taxiway to a full parallel for runway 14-32. Remove tree obstructions to meet 34:1 approach criteria per FAA Part 77 regulation
12-005 LUX $38,327.00 $26,959.00 $103,534.00 $0.00 $168,820.00 Engineering design services for rehabilitating runway 8/26, selected areas of parallel taxiway, and apron.