| 14-013 |
MKS |
$33,269.00 |
$33,269.00 |
$598,840.00 |
$0.00 |
$665,378.00 |
Clear obstructions in the approach to RWY 23 (37 parcels) |
| 14-012 |
AIK |
$9,740.00 |
$9,740.00 |
$175,325.00 |
$0.00 |
$194,805.00 |
Engineering & permitting services for expanded the terminal apron |
| 14-010 |
GYH |
$7,080.00 |
$7,081.00 |
$127,448.00 |
$0.00 |
$141,609.00 |
Runway Safety Area and Drainage Improvements for RWY 5-23. Project includes the full design for the airfield and construction of Phase 1. |
| 14-009 |
GRD |
$157,470.00 |
$157,470.00 |
$2,834,461.00 |
$0.00 |
$3,149,401.00 |
ALP Update; Bidding, Construction, Construction Phase Services, and Grant Services for the pavement and lighting rehabilitation for Runway 9-27. |
| 14-007 |
EOE |
$56,242.00 |
$56,242.00 |
$1,012,345.00 |
$0.00 |
$1,124,829.00 |
Apron Rehabilitation and Expansion (Construction)
Project consists of rehabilitation of the existing terminal apron and connectors from the apron to Taxiway 'A' and the expansion of the terminal apron. |
| 14-006 |
3J1 |
$432,694.00 |
$114,923.00 |
$162,000.00 |
$0.00 |
$709,617.00 |
Acquisition of 8 fee simple parcels and 59 easements. Project covers the professional services for closing on the fee simple parcels, professional services for purchasing the easements, and the estimated costs of the easements. |
| 14-005 |
UZA |
$103,301.00 |
$103,302.00 |
$1,859,426.00 |
$0.00 |
$2,066,029.00 |
Apron Rehabilitation (Construction) including construction administration, inspection and testing. This project includes the design of taxiway filet widening, and the repackaging of the taxiway rehabilitation design. |
| 14-004 |
MAO |
$57,720.00 |
$38,480.00 |
$0.00 |
$0.00 |
$96,200.00 |
Marion County Airport Terminal Renovation including:
New Rubber Roof, Re-glazing of windows, Window Tinting, Drop Ceiling, Paint, Carpet, VCT Tile, Outside Trim, Lighting, AC duct work, Handicap Ramps and hand rails, Bathroom sink lowering, installation of grab bars, and stall reconfiguration for ADA compliance. |
| 14-002 |
GMU |
$14,790.00 |
$4,930.00 |
$0.00 |
$0.00 |
$19,720.00 |
Application of seal coat to terminal and hangar parking areas. |
| 14-001 |
SMS |
$8,325.00 |
$48,894.00 |
$514,975.00 |
$0.00 |
$572,194.00 |
Phase II Land Acquisition and proposed Apron Rehabilitation and Expansion.
Construct Terminal Apron (7,650 SY) - Phase I - Design Only
Construct Taxilane (4,200 SY) - Phase I - Design Only
Acquire Land for Approaches - Runway Ends 5 and 23 - Five Parcels |
| 13-033 |
AQX |
$7,916.00 |
$7,917.00 |
$142,500.00 |
$0.00 |
$158,333.00 |
Perimeter Fencing - Design
Obstruction Removal - Design |
| 13-032 |
GGE |
$102,606.00 |
$102,606.00 |
$1,846,917.00 |
$0.00 |
$2,052,129.00 |
Rehabilitation of Taxiways A, B, and C. |
| 13-031 |
HVS |
$52,491.00 |
$52,492.00 |
$944,847.00 |
$0.00 |
$1,049,830.00 |
Runway Safety Area Development - Phase 2 - Construction (Including Obstruction Removal) |
| 13-030 |
35A |
$21,541.00 |
$21,542.00 |
$387,747.00 |
$0.00 |
$430,830.00 |
Update Airport Layout Plan; Remove Obstructions in Runway 5 and 23 Approaches (Design & Construction) |
| 13-028 |
MKS |
$25,927.00 |
$32,442.00 |
$525,324.00 |
$0.00 |
$583,693.00 |
Runway 23 Approach - Acquire Clearance Easements (Phase 1) on 28 parcels.
This phase includes all associated Title work, Surveys/Plats, Appraisals, Review Appraisals, Legal Fees, and Acquisition Costs of Easements. |
| 13-027 |
6J0 |
$37,230.00 |
$511,768.00 |
$453,184.00 |
$0.00 |
$1,002,182.00 |
ALP Update (including Business Plan) and T-hangar, Taxilane & Fencing Project |
| 13-026 |
PYG |
$8,016.00 |
$12,140.00 |
$181,398.00 |
$0.00 |
$201,554.00 |
Construction of Stub Taxiway |
| 13-025 |
GRD |
$8,375.00 |
$8,375.00 |
$150,752.00 |
$0.00 |
$167,502.00 |
Design, pre-design investigation services and Permitting services for the pavement and lighting rehabilitation for Runway 9-27 at Greenwood County Airport. |
| 13-024 |
AIK |
$9,557.00 |
$9,557.00 |
$172,021.00 |
$0.00 |
$191,135.00 |
Security Fencing Project
The purpose of this project is to finish the remaining part of the airport perimeter fence project that was built in 2008. This project includes the installation of approximately 2,445' of new 8' chain link fence with 3-strand barbed wire and dual-leaf swing gates including wildlife deterrent treatment. |
| 13-023 |
BNL |
$7,086.00 |
$7,087.00 |
$127,555.00 |
$0.00 |
$141,728.00 |
ALP Update |