06-009 GGE $68,679.00 $45,786.00 $0.00 $0.00 $114,465.00 Engineering design and bidding services for extending Runway 5 by 500' including the associated parallel taxiway. Topographical survey, geotechnical subsurface investigation, development of a disadvantage business enterprise (DBE) plan, and runway safety area improvement design will be provided for this project.
06-008 6J0 $3,499.00 $3,499.00 $132,946.00 $0.00 $139,944.00 Expand apron and construct vehicle access road
06-007 BNL $300,000.00 $300,000.00 $0.00 $0.00 $600,000.00 Construct new terminal building
06-005 HXD $129,073.00 $129,073.00 $4,904,765.00 $0.00 $5,162,911.00 Purchase an aircraft crash rescue fire fighting (ARFF) vehicle, including the expansion of the ARFF facility; acquire an emergency back-up generator for the airfield lighting system; widen and strengthen Runway 4/22; strengthen and expand the general aviation apron area (excluding pavement sealing); tree mitigation; and installation of security fencing
06-004 GGE $42,031.00 $42,031.00 $1,597,166.00 $0.00 $1,681,228.00 Conduct environmental assessment for extending runway 5 by 500 feet, improve the terminal access road and auto parking area, relocate the airfield lighting vault, remove and relocate the rotating beacon, and expand the aircraft parking apron
06-003 CDN $4,473.00 $4,473.00 $169,992.00 $0.00 $178,938.00 Engineering design services for a full parallel taxiway including rehabilitation of the existing partial parallel taxiway supporting runway 6/24.
06-002 6J2 $19,850.00 $19,850.00 $754,282.00 $0.00 $793,982.00 Rehabilitate the asphalt pavement of runway 5/23, stub taxiway, and apron area.
06-001 BBP $1,351.00 $1,351.00 $51,339.00 $0.00 $54,041.00 Update the airport layout plan and re-mark the runway and taxiway pavement markings
05-031A RBW $135,379.00 $45,126.00 $0.00 $0.00 $180,505.00 Amend grant 05-031 to include corporate hangar taxiways
05-031 RBW $207,278.00 $69,092.00 $0.00 $0.00 $276,370.00 For design and construction of an access road and taxiway to a corporate hangar area.
05-030 99N $6,141.00 $6,141.00 $233,344.00 $0.00 $245,626.00 Construct a partial parallel taxiway including medium intensity taxiway lights
05-029 HYW $3,950.00 $3,950.00 $150,000.00 $0.00 $157,900.00 Install perimeter fencing and security gates (Phase II)
05-028 CRE $5,395.00 $5,395.00 $205,000.00 $0.00 $215,790.00 Installation of 2-box precision approach path indicator lighting system (PAPI), upgrade all airfield electrical wiring and install lighted airfield signage.
05-027 GRD $8,892.00 $8,892.00 $337,902.00 $0.00 $355,686.00 Rehabilitate taxiway "D"
05-026 52J $19,552.00 $19,552.00 $742,958.00 $0.00 $782,062.00 Construct, pave, and mark Runway 6/24.
05-025 HVS $1,191.25 $10,789.75 $227,639.00 $0.00 $239,620.00 Update the airport master plan and assist in the acquisition of 41.72 acres of property for obstruction clearing.
05-024 MYR $0.00 $350,000.00 $0.00 $0.00 $350,000.00 Renovate general aviation terminal building
05-023 FLO $65,140.00 $65,764.00 $2,499,019.00 $0.00 $2,629,923.00 Seal pavement cracks on Runway 1/19, parallel taxiway to Runway 1/19 and the aircraft terminal parking apron, and reconstruct the general aviation aircraft parking apron
05-022 6J4 $8,078.00 $8,078.00 $306,971.00 $0.00 $323,127.00 Rehabilitate runway 1/19, stub taxiway and apron area with an asphalt overlay.
05-021 6J0 $17,630.00 $5,877.00 $0.00 $0.00 $23,507.00 Repair airfield lighting system.