| 15-003 |
UZA |
$8,328.00 |
$8,329.00 |
$149,913.00 |
$0.00 |
$166,570.00 |
Airport layout plan update |
| 15-002 |
GMU |
$26,654.00 |
$26,654.00 |
$0.00 |
$0.00 |
$53,308.00 |
Retrofit and replace incandescent lighting fixtures in terminal building and replace airfield sodium vapor security light fixtures using low energy LED fixtures. |
| 14-030 |
CDN |
$72,125.00 |
$72,125.00 |
$1,298,250.00 |
$0.00 |
$1,442,500.00 |
Phase III - Runway 6/24 land acquisition (27 Parcels) |
| 14-029 |
SPA |
$431,443.00 |
$431,443.00 |
$7,765,973.00 |
$0.00 |
$8,628,859.00 |
Phase I - Extend Runway 23 by 600' (To 5,800'). Engineering Design and Construction Services for Environmental Mitigation and Site Prep |
| 14-028 |
6J4 |
$21,813.00 |
$21,813.00 |
$392,645.00 |
$0.00 |
$436,271.00 |
Install 15,000 Linear Feet of Perimeter Fencing Including Access Gates |
| 14-027 |
3J1 |
$33,333.00 |
$33,334.00 |
$600,000.00 |
$0.00 |
$666,667.00 |
Phase I - Preliminary Engineering Design Services For a 4200' X 75' Runway to include Final Engineering Design Plans and Specs for Clearing, Grading, and Drainage of a 4,200' X75' runway. |
| 14-026 |
HXD |
$45,430.00 |
$45,431.00 |
$817,750.00 |
$0.00 |
$908,611.00 |
(A) Reimbursable for the Environmental Categorical Exclusion Service (B) Engineering Design and Bidding Services for Relocate Taxiway "A "and the General Aviation Apron Including Realignment of Taxiway "F" (C) Engineering Design Services for an Airfield Drainage Plan (D) Remove Trees between Air Traffic Control Tower and the General Aviation Apron (E) Environmental Assessment for Removing Trees to Runway 03 Approach (F) Engineering Design and Construction Services For Relocate Remote Transmitter Receiver (RTR) |
| 14-025 |
FDW |
$89,638.00 |
$89,638.00 |
$1,613,480.00 |
$0.00 |
$1,792,756.00 |
Runway 4/22 Safety Area Improvements |
| 14-024 |
CQW |
$3,612.00 |
$3,612.00 |
$65,011.00 |
$0.00 |
$72,235.00 |
Engineering, administration, and legal services for identifying obstructions. |
| 14-023 |
LKR |
$128,314.00 |
$128,314.00 |
$2,309,648.00 |
$0.00 |
$2,566,276.00 |
Install wildlife fencing and place an asphalt surface coarse on the parallel taxiway and connecting taxiways. Rehabilitate taxiway lighting system. |
| 14-022 |
OGB |
$20,901.00 |
$20,901.00 |
$376,218.00 |
$0.00 |
$418,020.00 |
Install wildlife fence |
| 14-021 |
CDN |
$30,500.00 |
$30,500.00 |
$549,000.00 |
$0.00 |
$610,000.00 |
Land acquisition for RWY 6/24 safety areas, engineering design for runway safety area, road relocation and highway intersection improvements, and obstruction clearing |
| 14-020 |
35A |
$9,248.00 |
$9,248.00 |
$166,455.00 |
$0.00 |
$184,951.00 |
Acquire property to the approach of RWY 23 - 1.5 acres of easement from Southside Fire District; Fee simple acquisition of .9 acres from the Palmer estate. |
| 14-019A |
SMS |
$1,320.00 |
$1,320.00 |
$23,760.00 |
$0.00 |
$26,400.00 |
Amend grant 14-019 to cover change orders associated with apron rehabilitation |
| 14-019 |
SMS |
$77,357.00 |
$77,357.00 |
$1,392,425.00 |
$0.00 |
$1,547,139.00 |
Rehabilitate terminal apron with a 10" concrete overlay |
| 14-018 |
CEU |
$22,511.00 |
$22,511.00 |
$405,205.00 |
$0.00 |
$450,227.00 |
Land acquisition to approach end of RWY 7 (4 Parcels, 2.5 acres); engineering design services for a stub TWY; and relocation of a power line. |
| 14-017 |
CRE |
$160,303.00 |
$160,303.00 |
$2,885,445.00 |
$0.00 |
$3,206,051.00 |
Phase II - Rehabilitate terminal apron with a concrete overlay including construction and construction administration. |
| 14-016 |
CUB |
$139,006.00 |
$139,006.00 |
$2,502,108.00 |
$0.00 |
$2,780,120.00 |
Phase I - TWY "A" extension (1000') - Environmental mitigation and construction |
| 14-015 |
GGE |
$22,136.00 |
$22,136.00 |
$398,454.00 |
$0.00 |
$442,726.00 |
Construct T-hangar taxilanes |
| 14-014 |
UDG |
$27,354.00 |
$27,354.00 |
$492,375.00 |
$0.00 |
$547,083.00 |
Asphalt rehabilitation of the apron and taxilane |