| 16-027 |
FLO |
$262,605.00 |
$262,605.00 |
$4,726,894.00 |
$0.00 |
$5,252,104.00 |
Rehabilitate airfield drainage system |
| 16-026 |
FLO |
$35,530.00 |
$35,531.00 |
$639,554.00 |
$0.00 |
$710,615.00 |
Aircraft rescue and firefighting (ARFF) site construction and architect and engineering redesign services |
| 16-025 |
RBW |
$56,249.00 |
$56,249.00 |
$1,012,482.00 |
$0.00 |
$1,124,980.00 |
Phase I construction services for apron drainage repairs and engineering design services for a Phase II airfield drainage analysis. |
| 16-024 |
CUB |
$4,200.00 |
$4,200.00 |
$75,600.00 |
$0.00 |
$84,000.00 |
Engineering design services for installing airfield guidance signs |
| 16-023 |
CDN |
$9,500.00 |
$9,500.00 |
$171,000.00 |
$0.00 |
$190,000.00 |
Engineering design services for improving the airport drainage system. |
| 16-020 |
DYB |
$9,229.00 |
$9,229.00 |
$166,118.00 |
$0.00 |
$184,576.00 |
Land acquisition - acquire 82.83 acres of Darlington Veneer to remove obstructive trees from approach end of RWY 6. |
| 16-019 |
GRD |
$2,872.00 |
$2,872.00 |
$51,689.00 |
$0.00 |
$57,433.00 |
Design and bidding services for auto parking lot rehabilititation |
| 16-018 |
DYB |
$9,580.00 |
$6,388.00 |
$0.00 |
$0.00 |
$15,968.00 |
Vehicle gate operator improvements |
| 16-017 |
MKS |
$113,767.00 |
$113,767.00 |
$2,047,806.00 |
$0.00 |
$2,275,340.00 |
Phase II - Relocate power lines in runway 5 approach |
| 16-016 |
LUX |
$51,003.00 |
$51,003.00 |
$918,054.00 |
$0.00 |
$1,020,060.00 |
Rehabilitate a portion of the parallel taxiway by of a concrete overlay. |
| 16-015 |
FDW |
$8,500.00 |
$8,500.00 |
$150,000.00 |
$0.00 |
$167,000.00 |
Design services for rehabilitating runway 4/22 medium intensity lighting and connecting taxiway edge lighting system. |
| 16-014 |
HXD |
$55,615.00 |
$55,615.00 |
$1,001,077.00 |
$0.00 |
$1,112,307.00 |
Acquire property to meet FAA's object free area standards for runway 3/21, including business relocation expenses. |
| 16-013 |
GMU |
$75,966.00 |
$25,322.00 |
$0.00 |
$0.00 |
$0.00 |
Replace EMAS arresting bed joint tape |
| 16-012 |
GMU |
$20,862.00 |
$20,862.00 |
$375,512.00 |
$0.00 |
$417,236.00 |
Fee simple acquistion of 2.37 acres of land along airport road |
| 16-011 |
UZA |
$209,609.00 |
$209,609.00 |
$3,772,962.00 |
$0.00 |
$4,192,180.00 |
Rehabilitate parallel taxiway and taxiway filet widening |
| 16-010 |
SMS |
$4,974.00 |
$4,974.00 |
$89,536.00 |
$0.00 |
$99,484.00 |
Engineering design and bidding services for replacing airfield lighting with LED fixtures, including PAPIS and REILS. |
| 16-009 |
3J1 |
$36,452.00 |
$24,301.00 |
$0.00 |
$0.00 |
$60,753.00 |
Rehabilitate apron/hangar taxilane
Original grant $29,912/$19,941 (60%/40%)
Project amended on February 12th to add more paving and drainage improvements
New grant $36,452/$24,301 |
| 16-008 |
3J1 |
$85,151.00 |
$85,152.00 |
$1,532,727.00 |
$0.00 |
$1,703,030.00 |
Land acquisition - (Bedell tracts - tax map 661 and 14801) |
| 16-007 |
RBW |
$17,996.00 |
$17,996.00 |
$323,927.00 |
$0.00 |
$359,919.00 |
(A)Update airport layout plan
(B) Airfield drainage study
(C) Engineering design services for drainage repairs in the apron area |
| 16-006 |
SPA |
$474,743.00 |
$474,743.00 |
$8,545,378.00 |
$0.00 |
$9,494,864.00 |
Phase II site preparation for 600' runway extension |