Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
04-005 GRD $11,398.00 $11,398.00 $205,167.00 $0.00 $227,963.00 Install perimeter fencing, gates (drive-thru and pedestrian), and electronic card control access system.
04-003 CEU $8,125.00 $8,125.00 $146,250.00 $0.00 $162,500.00 Conduct a NEPA environmental assessment for Phase I proposed actions as consistent with the Oconee County Regional airport layout plan.
04-002 AQX $0.00 $80,000.00 $0.00 $0.00 $80,000.00 Construct terminal building.
04-001 HYW $200,000.00 $1,016,019.00 $0.00 $22,279.00 $1,238,298.00 Construct terminal building.
03-037 LUX $16,666.00 $16,667.00 $300,000.00 $0.00 $333,333.00 Site preparation for completing the parallel taxiway and updating the airport master plan.
03-036 BNL $75,701.00 $75,702.00 $1,362,627.00 $0.00 $1,514,030.00 Rehabilitate runway 16/34, install a new medium intensity runway lighting system, construct an airfield lighting vault, and obstruction clearing.
03-035 MNI $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 Construct hangar taxilane
03-034 DYB $36,022.00 $36,023.00 $648,398.00 $0.00 $720,443.00 Apron rehabilitation and fencing project and update the airport layout plan.
03-033 GGE $17,680.00 $17,680.00 $318,240.00 $0.00 $353,600.00 Construct t-hangar taxiways.
03-032 BBP $8,946.00 $8,946.00 $161,023.00 $0.00 $178,915.00 Runway 24 approach clearing, vault improvements, wind cone replacement, and automated weather observation system (AWOS) installation.
03-031A SMS $19,444.00 $19,444.00 $350,000.00 $0.00 $388,888.00 Grant Amendment - Rehabilitate runway 5/23.
03-031 SMS $61,111.00 $61,111.00 $1,100,000.00 $0.00 $1,222,222.00 Rehabilitate runway 5/23 with an asphalt overlay.
03-030 6J4 $3,518.00 $3,518.00 $63,317.00 $0.00 $70,353.00 Develop an airport layout plan
03-029 AQX $1,752.00 $1,752.00 $31,526.00 $0.00 $35,030.00 Parallel taxiway design
03-028 LQK $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 T-hangar taxiway paving project
03-027 CDN $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 Installation of precision approach path indicator lights (PAPIS) and runway end identify lights (REILS).
03-026 HVS $12,553.00 $12,553.00 $225,959.00 $0.00 $251,065.00 Installation of a new medium intensity runway lighting system, electrical vault, and perimeter fencing.
03-025 CQW $40,688.00 $13,562.00 $0.00 $0.00 $54,250.00 Sealing of airfield pavement cracks.
03-024 FDW $8,803.00 $32,864.00 $375,000.00 $0.00 $416,667.00 Land acquisition, environmental assessment, and related professional fees for acquiring property toward a future runway extension project.
03-023 EOE $5,505.00 $5,505.00 $99,083.00 $0.00 $110,093.00 Runway development alternatives analysis and environmental assessment.