05-020 51J $48,750.00 $16,250.00 $0.00 $0.00 $65,000.00 Crack sealing airfield pavements and install light control for runway lights.
05-018 UDG $23,376.00 $23,376.00 $888,296.00 $0.00 $935,048.00 Extend Runway 23 and the parallel taxiway system by 500' and relocate 2,787' of Horse Branch Terrace Road
05-017 MKS $1,973.00 $1,974.00 $75,000.00 $0.00 $78,947.00 Environmental assessment study for the following work elements: Complete parallel taxiway, relocate non-directional beacon, security fencing, runway pavement resurfacing/strengthening, ODALS on Runway 5 approach end, expansion of the aircraft parking apron and construction of T-hangars and box hangars in the terminal area.
05-016 ARW $30,739.00 $30,739.00 $1,168,088.00 $0.00 $1,229,566.00 Construct partial parallel taxiway and rehabilitate asphalt apron.
05-015 AND $80,763.00 $80,763.00 $3,068,980.00 $0.00 $3,230,506.00 Extend RWY 5 (850') and RWY 23 (150') - project consist of paving, marking, lighting, re-installation of the glide slope antenna and the medium intensity approach lighting system with runway alignment indicator lights (MALSR) including the installation of precision approach path indicator lights (PAPI)
05-014 35A $16,737.00 $16,737.00 $636,000.00 $0.00 $669,474.00 Pave runway 5/23 with asphalt, including paving of a 550' runway extension, and installation of medium intensity runway lights.
05-013 LKR $7,956.00 $10,278.00 $300,000.00 $0.00 $318,234.00 Install an automated weather observation system (AWOS III)
05-012 AQX $20,444.00 $20,444.00 $776,887.00 $0.00 $817,775.00 Construct parallel taxiway to Runway 17/35.
05-011 CEU $22,250.00 $22,250.00 $0.00 $0.00 $44,500.00 Engineering services for relocating SR-37 (Shiloh Road). Project task will include project formulation, preliminary road alignment, coordination with South Carolina Department of Transportation for road alignment and applicable design standards.
05-010 DYB $16,324.00 $16,324.00 $620,300.00 $0.00 $652,948.00 Construct and rehabilitate t-hangar taxilanes
05-009 CEU $3,050.00 $3,050.00 $115,900.00 $0.00 $122,000.00 Update the 2002 runway extension justification study, 2002 airport layout plan and narrative report, conduct an airport property survey plat, and update the 2004 environmental assessment documents.
05-008 CQW $3,335.00 $3,335.00 $126,713.00 $0.00 $133,383.00 Installation of security fencing
05-007 GGE $3,480.00 $1,160.00 $0.00 $0.00 $4,640.00 Clean 33,000 SF of painted runway markings on runway 5/23.
05-006 AND $114,155.00 $80,762.63 $3,068,979.75 $0.00 $3,263,897.38 Extend runway 5/23 and the parallel taxiway 850' X 150', to include utility relocation, site preparation, miscellaneous land acquisition cost for wetland mitigation, survey and engineering construction services, and MALSR demolition.
05-005 AND $38,911.00 $38,911.00 $1,478,605.00 $0.00 $1,556,427.00 Phase II site preparation; 850' runway extension to the runway 5 approach end.
05-004 CKI $3,766.00 $3,766.00 $67,788.00 $0.00 $75,320.00 Update the airport layout plan and have engineering design services rehabilitate the stub taxiway and apron areas with a five inch concrete overlay
05-002 CEU $6,000.00 $2,000.00 $0.00 $0.00 $8,000.00 Refurbish rotating beacon
05-001 PHH $41,432.00 $41,432.00 $1,574,426.00 $0.00 $1,657,290.00 Rehabilitate runway 18/36, stub taxiway, and apron pavements, improve the runway safety areas, install a new medium intensity runway lighting system and lighting vault, install precision approach path indicators (PAPI), and a new rotating beacon.
04-028 LKR $4,192.00 $4,192.00 $159,296.00 $0.00 $167,680.00 Runway 6 one hundred foot threshold relocation and automated weather observation system (AWOS) design project.
04-027 GRD $2,211.00 $2,211.00 $84,031.00 $0.00 $88,453.00 Design services for rehabilitating taxiway "D".