| 03-022 |
CRE |
$262,104.00 |
$87,368.00 |
$0.00 |
$0.00 |
$349,472.00 |
Airfield pavement maintenance: Project to include asphalt crack sealing, application of sealer/rejuvenator, and airfield markings. |
| 03-021 |
CRE |
$18,002.00 |
$18,002.00 |
$324,032.00 |
$0.00 |
$360,036.00 |
Rehabilitate the apron in front of the fixed base operator's terminal/hangar building complex. |
| 03-020 |
HYW |
$46,524.00 |
$46,524.00 |
$837,433.00 |
$0.00 |
$930,481.00 |
Rehabilitate runway 4/22 and a portion of the parallel taxiway. |
| 03-019 |
DCM |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Design services for rehabilitating runway 17/35 and for updating the existing airport layout plan including a property survey. |
| 03-018 |
6J0 |
$9,995.00 |
$9,995.00 |
$179,915.00 |
$0.00 |
$199,905.00 |
Construction of security fencing and installation of three gates. |
| 03-017 |
RBW |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
(A) Reinstall existing omni-directional approach lighting system (ODALS) on runway 23.
(B) Relocate existing precision approach path indicator lighting system (PAPIS) on runway 23.
(C) Install security fencing along Thunderbolt and Sidneys Roads. |
| 03-016 |
GMU |
$47,195.00 |
$47,195.00 |
$849,517.00 |
$0.00 |
$943,907.00 |
Overlay parallel taxiway "A" and reimbursement of legal fees and court cost for the installation of a MALS-F system on runway 1. |
| 03-015 |
CQW |
$14,732.00 |
$14,733.00 |
$265,185.00 |
$0.00 |
$294,650.00 |
Pave, mark, and light a 600' extension to runway 7/25 including a partial parallel taxiway. |
| 03-014 |
UDG |
$10,032.00 |
$10,033.00 |
$180,585.00 |
$0.00 |
$200,650.00 |
Phase I - design services, extend runway 23 by 500' including the parallel taxiway; relocate approximately 2,750' of Horse Branch Terrace; and prepare a new airport layout plan. |
| 03-013 |
99N |
$11,527.00 |
$11,528.00 |
$207,490.00 |
$0.00 |
$230,545.00 |
Seal pavement cracks in runway 5/23 and connecting taxiways; install coal-tar emulsion seal coat on existing apron; install precision approach path indicator lights (PAPIS) on runway 5/23; install rotating beacon; install wind cone and segmented circle; and install new medium intensity runway lights on runway 5/23. |
| 03-012 |
AND |
$13,778.00 |
$13,778.00 |
$248,000.00 |
$0.00 |
$275,556.00 |
Phase II - runway extension; final design for site preparation for runway and taxiway extension (1000' x 100') and preliminary engineering for glide slope/MALSR relocation. |
| 03-011 |
BNL |
$11,692.00 |
$11,693.00 |
$210,468.00 |
$0.00 |
$233,853.00 |
Installation of an automated weather observation station (AWOS) and for engineering design services for rehabilitating runway 16/34. |
| 03-010 |
HXD |
$46,300.00 |
$46,300.00 |
$833,400.00 |
$0.00 |
$926,000.00 |
Installation of an automated weather observation system (AWOS); Engineering design services for a runway, taxiway, and apron asphalt rehabilitation project, including runway widening; Design for a runway blast pad and auto parking lot expansion, disadvantage business enterprise plan (DBE); preliminary feasibility study for extending the existing runway, and for security related projects (fencing and gates). |
| 03-009 |
HXD |
$183,333.00 |
$439,157.00 |
$985,000.00 |
$0.00 |
$1,607,490.00 |
Construct and equip an air traffic control tower |
| 03-008 |
ARW |
$20,553.00 |
$20,554.00 |
$369,964.00 |
$0.00 |
$411,071.00 |
Construction of apron and t-hangar taxilanes - Phase I |
| 03-007 |
ARW |
$10,920.00 |
$10,920.00 |
$0.00 |
$0.00 |
$21,840.00 |
Installation of Electro braid Fencing. |
| 03-006 |
HVS |
$9,000.00 |
$0.00 |
$0.00 |
$0.00 |
$9,000.00 |
Removal of brush and trees in the northeast end of airport property. Obstruction will be removed by Ashpluhdh Tree Company. |
| 03-005 |
35A |
$45,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$60,000.00 |
Rejuvenate, crack seal, and paint runway 5/23. |
| 03-004 |
AIK |
$108,633.00 |
$108,633.00 |
$1,955,397.00 |
$0.00 |
$2,172,663.00 |
Extend RWY 6 by 500', rehabilitate runway 6/24, and the parallel taxiway. |
| 03-003 |
CDN |
$72,185.00 |
$24,062.00 |
$0.00 |
$0.00 |
$96,247.00 |
Apply coal-tar sealer/rejuvenator to runway 6/24 including painting of the runway markings. |