| 18-013 |
GMU |
$172,200.00 |
$156,250.00 |
$2,238,297.00 |
$0.00 |
$2,566,747.00 |
Rehabilitate Airfield Lighting for Rwy 01-19, Twy A and Twy B, Rehabilitate Rwy 01 MALSF System. Prepare Stormwater Master Plan, Update Stormwater Pollution Prevention Plan. |
| 18-012 |
ARW |
$60,841.00 |
$60,841.00 |
$1,095,143.00 |
$0.00 |
$1,216,825.00 |
Replace Runway/Taxiway Edge Lights, PAPI's, REIL's, Windsock, Vault and Signage (Design and Construction) |
| 18-011 |
CDN |
$102,924.00 |
$102,924.00 |
$1,852,627.00 |
$0.00 |
$2,058,475.00 |
Improve Airport Drainage (9,700 LF) |
| 18-010 |
CEU |
$38,890.00 |
$38,890.00 |
$700,017.00 |
$0.00 |
$777,797.00 |
Land Acquisition - Rwy 7 Approach (Property and Relocation)
Terminal Apron Expansion (30,000 SY) Design
Project also includes Amendment to provide State Participation in FAA grant for Terminal Area Planning
FAA: |
| 18-009 |
HXD |
$110,095.00 |
$110,095.78 |
$1,981,717.00 |
$0.00 |
$2,201,907.77 |
Land Acquisition Reimbursement (Rwy 3/21) |
| 18-007 |
AND |
$500,000.00 |
$1,302,826.00 |
$0.00 |
$1,700,000.00 |
$3,502,826.00 |
New General Aviation Terminal Building |
| 18-004 |
AND |
$290,537.00 |
$1,476,247.00 |
$5,229,650.00 |
$0.00 |
$6,996,434.00 |
Rehabilitate center 100' width of runway 5/23 |
| 18-003 |
RBW |
$31,778.00 |
$31,778.00 |
$572,000.00 |
$0.00 |
$635,556.00 |
Acquire airfield emergency generator and Phase II - airfield drainage repairs. |
| 18-002 |
CRE |
$31,522.00 |
$31,522.00 |
$567,399.00 |
$0.00 |
$630,443.00 |
Engineering design services for rehabilitating runway 5/23 |
| 18-001 |
HYW |
$8,334.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,668.00 |
Engineering design and site development services for installing a 4-box PAPI system |
| 17-024 |
FDW |
$0.00 |
$39,000.00 |
$702,000.00 |
$0.00 |
$0.00 |
Rehabilitate runway and taxiway lighting system |
| 17-023 |
GGE |
$10,622.00 |
$10,622.00 |
$191,192.00 |
$0.00 |
$212,436.00 |
Engineering design services to expand apron by 4,330 SY, engineering services to improve airport drainage, and runway 5/23 obstruction analysis. |
| 17-022 |
6J2 |
$23,540.00 |
$23,540.00 |
$423,725.00 |
$0.00 |
$470,805.00 |
Land acquisition of 7 pacels of property totally 49.29 acres, including tree obstuction removal within the 7 parcels. |
| 17-021 |
RBW |
$500,000.00 |
$1,819,719.00 |
$0.00 |
$0.00 |
$2,319,719.00 |
Renovate and Expand Terminal Building |
| 17-020 |
GMU |
$10,500.00 |
$3,500.00 |
$0.00 |
$0.00 |
$14,000.00 |
RWY 10 approach - obstruction tree removal |
| 17-019 |
SPA |
$673,838.00 |
$673,838.00 |
$12,129,079.00 |
$0.00 |
$13,476,755.00 |
Phase III - Rehabilitate RWY 5/23 - 5200', pave 600' extension of runway 23, install new runway edge lighting system (Original Grant was $11,181,064 FAA/$621,170 Local/$621,170 State)
Amendment 1 Added $948,015 in FAA funds to cover:
1. Asphalt Surface Course and Tack Coat overrun ($233,951)
2. Letter of Map Revision (LOMR) and Downstream Assessment Study ($72,000)
3. Rwy 5/23 NAVAIDS (Glideslope, PAPI's) ($794,439)
4. Construction Admin for NAVIDS installation ($70,000)
NOTE: FAA amendment does not cover all project costs, so there may be one more amendment |
| 17-018 |
GGE |
$286,637.00 |
$191,092.00 |
$0.00 |
$0.00 |
$477,729.00 |
Design and construct a taxiway to serve corporate hangars |
| 17-017 |
GYH |
$191,601.00 |
$191,602.00 |
$3,448,823.00 |
$0.00 |
$3,832,026.00 |
Reconstruct north end of Taxiway A - 3,200' X 50' including the construction of 300' of Taxiway B4 Connector. |
| 17-016 |
ARW |
$35,796.00 |
$36,850.00 |
$653,810.00 |
$0.00 |
$726,456.00 |
Runway 7 tree removal, design and bidding services for extending parallel taxiway to the end of runway 25, apron expansion, helipad, and runway safety area improvements, including storm water polution prevention plan. |
| 17-015 |
3J1 |
$11,490.00 |
$11,491.00 |
$206,830.00 |
$0.00 |
$229,811.00 |
Engineering design services for a terminal apron and auto parking lot, including terminal access road |