Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
18-013 GMU $172,200.00 $156,250.00 $2,238,297.00 $0.00 $2,566,747.00 Rehabilitate Airfield Lighting for Rwy 01-19, Twy A and Twy B, Rehabilitate Rwy 01 MALSF System. Prepare Stormwater Master Plan, Update Stormwater Pollution Prevention Plan.
18-012 ARW $60,841.00 $60,841.00 $1,095,143.00 $0.00 $1,216,825.00 Replace Runway/Taxiway Edge Lights, PAPI's, REIL's, Windsock, Vault and Signage (Design and Construction)
18-011 CDN $102,924.00 $102,924.00 $1,852,627.00 $0.00 $2,058,475.00 Improve Airport Drainage (9,700 LF)
18-010 CEU $38,890.00 $38,890.00 $700,017.00 $0.00 $777,797.00 Land Acquisition - Rwy 7 Approach (Property and Relocation) Terminal Apron Expansion (30,000 SY) Design Project also includes Amendment to provide State Participation in FAA grant for Terminal Area Planning FAA:
18-009 HXD $110,095.00 $110,095.78 $1,981,717.00 $0.00 $2,201,907.77 Land Acquisition Reimbursement (Rwy 3/21)
18-007 AND $500,000.00 $1,302,826.00 $0.00 $1,700,000.00 $3,502,826.00 New General Aviation Terminal Building
18-004 AND $290,537.00 $1,476,247.00 $5,229,650.00 $0.00 $6,996,434.00 Rehabilitate center 100' width of runway 5/23
18-003 RBW $31,778.00 $31,778.00 $572,000.00 $0.00 $635,556.00 Acquire airfield emergency generator and Phase II - airfield drainage repairs.
18-002 CRE $31,522.00 $31,522.00 $567,399.00 $0.00 $630,443.00 Engineering design services for rehabilitating runway 5/23
18-001 HYW $8,334.00 $8,334.00 $150,000.00 $0.00 $166,668.00 Engineering design and site development services for installing a 4-box PAPI system
17-024 FDW $0.00 $39,000.00 $702,000.00 $0.00 $0.00 Rehabilitate runway and taxiway lighting system
17-023 GGE $10,622.00 $10,622.00 $191,192.00 $0.00 $212,436.00 Engineering design services to expand apron by 4,330 SY, engineering services to improve airport drainage, and runway 5/23 obstruction analysis.
17-022 6J2 $23,540.00 $23,540.00 $423,725.00 $0.00 $470,805.00 Land acquisition of 7 pacels of property totally 49.29 acres, including tree obstuction removal within the 7 parcels.
17-021 RBW $500,000.00 $1,819,719.00 $0.00 $0.00 $2,319,719.00 Renovate and Expand Terminal Building
17-020 GMU $10,500.00 $3,500.00 $0.00 $0.00 $14,000.00 RWY 10 approach - obstruction tree removal
17-019 SPA $673,838.00 $673,838.00 $12,129,079.00 $0.00 $13,476,755.00 Phase III - Rehabilitate RWY 5/23 - 5200', pave 600' extension of runway 23, install new runway edge lighting system (Original Grant was $11,181,064 FAA/$621,170 Local/$621,170 State) Amendment 1 Added $948,015 in FAA funds to cover: 1. Asphalt Surface Course and Tack Coat overrun ($233,951) 2. Letter of Map Revision (LOMR) and Downstream Assessment Study ($72,000) 3. Rwy 5/23 NAVAIDS (Glideslope, PAPI's) ($794,439) 4. Construction Admin for NAVIDS installation ($70,000) NOTE: FAA amendment does not cover all project costs, so there may be one more amendment
17-018 GGE $286,637.00 $191,092.00 $0.00 $0.00 $477,729.00 Design and construct a taxiway to serve corporate hangars
17-017 GYH $191,601.00 $191,602.00 $3,448,823.00 $0.00 $3,832,026.00 Reconstruct north end of Taxiway A - 3,200' X 50' including the construction of 300' of Taxiway B4 Connector.
17-016 ARW $35,796.00 $36,850.00 $653,810.00 $0.00 $726,456.00 Runway 7 tree removal, design and bidding services for extending parallel taxiway to the end of runway 25, apron expansion, helipad, and runway safety area improvements, including storm water polution prevention plan.
17-015 3J1 $11,490.00 $11,491.00 $206,830.00 $0.00 $229,811.00 Engineering design services for a terminal apron and auto parking lot, including terminal access road