South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
19-016 CEU $60,374.00 $60,374.00 $1,086,721.00 $0.00 $1,207,469.00 Relocate Nebo Church Road - Construction
19-015 HXD $14,497.00 $14,497.00 $260,944.00 $0.00 $289,938.00 Conduct EA for : (1) Prop Terminal Bldg Expansion; (2) Prop Terminal Apron Expansion; (3) Prop Automobile Parking Expansion; (4) Strengthen Rwy 03-21
19-010 S19 $1,800.00 $1,200.00 $0.00 $0.00 $3,000.00 Install security cameras at McCormick County Airport
19-009 3J0 $53,458.00 $17,820.00 $0.00 $0.00 $71,278.00 Tree clearing at each end of Rwy 11-29
19-007 AQX $6,939.00 $6,939.00 $124,910.00 $0.00 $138,788.00 ALP Update
19-006 MNI $9,232.00 $9,232.00 $166,171.00 $0.00 $184,635.00 Update ALP, Improve Airfield Fencing (Design), Relocate Windsock (Design)
19-003 GGE $37,157.00 $37,157.00 $668,819.00 $0.00 $743,133.00 Apron Expansion, Phase IV
19-002 GRD $8,333.00 $8,333.00 $149,997.00 $0.00 $166,663.00 Taxiways A and B Pavement Rehabilitation Project (Design & Bid) and Runway 9-27 Aerial Obstruction Survey and Analysis
19-001 SMS $10,059.00 $10,058.00 $181,053.00 $0.00 $201,170.00 Airport Layout Plan Update
18-024 6J0 $5,750.00 $5,750.00 $103,497.00 $0.00 $114,997.00 North Apron Reconstruction (Design, Permit, Build)
18-023 FDW $3,975.00 $3,975.00 $71,550.00 $0.00 $79,500.00 Update Airport Master Plan (Airfield Drainage Study)
18-022 LKR $6,575.00 $6,575.00 $118,346.00 $0.00 $131,496.00 Apron Rehabilitation and Runway End Identifier Lights for Rwy 6-24
18-021 EOE $33,333.00 $33,334.00 $600,001.00 $0.00 $666,668.00 Renovate Airport Terminal Building (Construction) (AIP 3-45-0066-013-2018) - $26,383 Renovate Airport Terminal Building (Design Amendment) (AIP 3-45-0066-012-2017) - $6,950
18-020 BBP $5,670.00 $5,670.00 $102,056.00 $0.00 $113,396.00 Rehabilitate Southern Portion of Twy A and Rehabilitate Terminal Apron
18-019 DCM $8,251.00 $8,251.00 $148,517.00 $0.00 $165,019.00 Rehabilitate Twy A, Twy D, Twy E - Design and Bidding. Reimbursement for Land Acquisition in Rwy 35 Approach
18-018 CUB $10,883.00 $11,217.00 $195,900.00 $0.00 $218,000.00 Twy B Extension Wetland Mitigation Monitoring (Yr 3-5); Rehabilitate Perimeter Fencing (11,000 LF) - Design; Rehabilitate Access Road - Design; Rehabilitate Twy A5 (300 LF) - Design; Improve Airport Drainage (Structures, Culvert, Retaining Wall - Design; Rehabilitate Apron (Compass Calibration Pad Installation)
18-017 SPA $22,340.00 $22,340.00 $402,114.00 $0.00 $446,794.00 Update Airport Master Plan, Acquire Land in Rwy 23 Approach (Reimbursement) 4 Parcels
18-016 FLO $55,555.00 $55,556.00 $1,000,000.00 $0.00 $1,111,111.00 Replace Twy A Lights, PAPI's, REIL's, Convert Wind Sock and Distance Remaining Signs to LED (Design). Phase 1 Construction of Vault and Wind Cone
18-015 UZA $11,700.00 $11,700.00 $210,602.00 $0.00 $234,002.00 Rwy 20 Obstruction Removal
18-014 CRE $364,127.00 $364,127.75 $6,554,292.75 $0.00 $7,282,547.50 Rehabilitate Rwy 5/23