| 21-020 |
LQK |
$240,000.00 |
$160,000.00 |
$0.00 |
$0.00 |
$400,000.00 |
Runway 23 End Crossfield Taxiway Apron Development - Design |
| 21-017 |
GMU |
$283,851.00 |
$189,233.00 |
$0.00 |
$0.00 |
$473,084.00 |
West Ramp Reconstruction (Non-AIP Eligible) |
| 21-016 |
SPA |
$739.00 |
$246.00 |
$0.00 |
$0.00 |
$985.00 |
Fence Repairs |
| 21-015 |
3J0 |
$49,932.00 |
$12,483.00 |
$0.00 |
$0.00 |
$62,415.00 |
Aeronautical survey in accordance with FAA AC 150/5300-18B |
| 21-014 |
OGB |
$14,000.00 |
$5,000.00 |
$0.00 |
$0.00 |
$19,000.00 |
Repaint Beacon Tower |
| 21-013 |
3J1 |
$5,175.00 |
$1,725.00 |
$0.00 |
$0.00 |
$6,900.00 |
Repaint airport rotating beacon monopole. |
| 21-012 |
DCM |
$56,000.00 |
$18,000.00 |
$0.00 |
$0.00 |
$74,000.00 |
Clear trees from approaches to runways 17 and 35 (approximately 20 acres) |
| 21-011 |
SMS |
$97,175.77 |
$64,783.84 |
$0.00 |
$0.00 |
$161,959.60 |
Reimbursement for acquisition of 22.68 acres of land located south of Sumter County Airport. |
| 21-010 |
ARW |
$21,171.00 |
$14,114.00 |
$0.00 |
$0.00 |
$35,285.00 |
Install emergency generator and three connection points |
| 21-009 |
SMS |
$24,000.00 |
$16,000.00 |
$0.00 |
$0.00 |
$40,000.00 |
Repair Brick Retaining Wall
Repair Terminal Building Cabinetry |
| 21-008 |
GGE |
$135,148.00 |
$90,099.00 |
$0.00 |
$0.00 |
$225,247.00 |
T-Hangar Taxilanes Northeast of Terminal Building |
| 21-006 |
MKS |
$24,382.00 |
$11,718.00 |
$0.00 |
$0.00 |
$36,100.00 |
Replace Beacon
Project to be funded at:
Replace Beacon (60/40) $10,770 State/$7,180 Local
Repaint Tower (75/25) $13,612 State/$4,538 Local |
| 21-005 |
HVS |
$56,573.00 |
$37,715.00 |
$0.00 |
$0.00 |
$94,288.00 |
Terminal Area Improvements (Parking, fencing, landscaping and security cameras) |
| 21-004 |
UZA |
$6,477.00 |
$4,318.00 |
$0.00 |
$0.00 |
$10,795.00 |
Ground Communication Outlet |
| 21-003 |
CEU |
$18,900.00 |
$6,300.00 |
$0.00 |
$0.00 |
$25,200.00 |
Emergency Asphalt Repair - Rwy 7-25 |
| 21-002 |
6J4 |
$8,000.00 |
$2,000.00 |
$0.00 |
$0.00 |
$10,000.00 |
Construct 14' x 20' Conference Room in Terminal Building |
| 21-001 |
BPP |
$6,342.00 |
$4,228.00 |
$0.00 |
$0.00 |
$10,570.00 |
Update Stormwater Pollution Prevention Plan for Marlboro County Jetport |
| 20-012 |
LQK |
$45,177.00 |
$45,176.00 |
$813,175.00 |
$0.00 |
$903,528.00 |
Land Acquisition for Crossfield Apron/Taxiway Development (4.9 Acres) |
| 20-011 |
3J0 |
$24,000.00 |
$6,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Design Airport Fencing |
| 20-010 |
3J0 |
$40,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$50,000.00 |
Airport Master Plan |